Home / Tier I vs Tier II vs PE
Qualified facilities, 40 CFR 112.3(g) and 112.6
Tier I vs Tier II vs a PE-certified SPCC plan
EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).
An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.
- Free eligibility check first
- Editable DOCX and PDF
- Every requirement cited to 40 CFR
- Missing-element guarantee, plus 30 days no questions asked
The short answer
| Plan type | Who may use it | Who certifies |
|---|---|---|
| Tier I | Total aboveground oil storage of 10,000 gallons or less, no single aboveground container over 5,000 gallons, and a clean spill history (40 CFR 112.3(g)(1)) | The owner or operator, using the Appendix G template or an equivalent plan with a cross-reference (40 CFR 112.6(a)(1)) |
| Tier II | Total aboveground oil storage of 10,000 gallons or less and a clean spill history. The required route if any container is over 5,000 gallons; optional for a Tier I facility (40 CFR 112.3(g)(2), 40 CFR 112.6(a)(1)) | The owner or operator, in a full plan meeting 112.7 and 112.8 (40 CFR 112.6(b)(1)) |
| PE-certified (we do not sell these) | Everyone else, and anyone who prefers it | A licensed Professional Engineer, who must visit the site (40 CFR 112.3(d), 40 CFR 112.3(d)(1)(ii)) |
The spill-history test, exactly
Both tiers require a clean record of discharges to water. Both of these must hold:
- In the 3 years before the self-certification date, the facility has had no single discharge to navigable waters or adjoining shorelines of more than 1,000 U.S. gallons. (40 CFR 112.3(g)(2))
- In the 3 years before the self-certification date, the facility has had no two discharges to navigable waters or adjoining shorelines each of more than 42 U.S. gallons within any 12-month period. (40 CFR 112.3(g)(2))
Three details people get wrong:
- Under 40 CFR 112.3(g)(2), the 1,000-gallon and 42-gallon discharge-history thresholds count discharges as described in 40 CFR 112.1(b) (into or upon navigable waters of the United States or adjoining shorelines). EPA explains that these amounts refer to the oil that actually reaches navigable waters or adjoining shorelines, not the total amount spilled, so a spill that did not reach navigable waters or adjoining shorelines does not count. (40 CFR 112.3(g)(2))
- Discharges that were the result of natural disasters, acts of war or terrorism do not count against the qualified-facility discharge history. (40 CFR 112.3(g)(2))
- If the facility has been operating for less than 3 years, the discharge history covers the period since it became subject to Part 112. (40 CFR 112.3(g)(2))
Four facilities, classified
What is different inside the plans
A Tier I plan follows EPA's template: a container table, a containment table, an inspection schedule, security, emergency procedures and contacts, and a short list of onshore requirements (40 CFR Part 112 Appendix G). A Tier II plan must discuss conformance with every applicable paragraph of 112.7 and the onshore requirements of 112.8 (40 CFR 112.6(b)(3)): facility drainage (40 CFR 112.7(a)(3)(iii)), discharge prediction for each container (40 CFR 112.7(b)), a facility diagram (40 CFR 112.7(a)(3)), and a cross-reference table (40 CFR 112.7). Some specifics:
| Topic | Tier I | Tier II |
|---|---|---|
| Containment sizing | Secondary containment for the bulk storage containers (including mobile or portable oil storage containers, but not mobile refuelers or other non-transportation-related tank trucks) holds the capacity of the largest container plus additional capacity to contain precipitation. (40 CFR 112.6(a)(3)(ii)) | Each bulk storage container installation (except mobile refuelers and other non-transportation-related tank trucks) has a secondary means of containment for the entire capacity of the largest single container and sufficient freeboard to contain precipitation. (40 CFR 112.8(c)(2)) |
| Overfill prevention | Each container has a system or documented procedure to prevent overfills, described in this Plan, and it is regularly tested to ensure proper operation or efficacy. (40 CFR 112.6(a)(3)(iii)) | At least one listed device per container installation, such as a high-level alarm or pump cutoff (40 CFR 112.8(c)(8)) |
| Facility diagram | A facility diagram is not a required element of a Tier I Plan; this Plan includes one to help inspectors and responders. (40 CFR 112.6(a)(3)) | Required (40 CFR 112.7(a)(3)) |
| Containment impracticable | A Tier I Plan cannot rely on a determination that secondary containment is impracticable. Every container and area that needs containment must have it, or the facility must use a Tier II Plan with a PE-certified impracticability determination, or a full PE Plan. (40 CFR 112.6(a)(1)(vii)) | Only with a PE-certified determination (40 CFR 112.6(b)(3)(ii)) |
A Tier I facility may also choose a Tier II plan or a PE plan (40 CFR 112.6(a)(1)). See the full list of sections for each tier on the sample plan page.
When you need a Professional Engineer
- Total aboveground capacity over 10,000 gallons, or a disqualifying spill. This facility does not meet the qualified facility criteria in 40 CFR 112.3(g), so its Plan must be reviewed and certified by a licensed Professional Engineer, who (or whose agent) must visit and examine the facility. We do not sell a plan for this facility.
- Alternative measures or impracticability determinations, even inside a Tier II plan. A Tier II owner cannot self-certify alternative measures under 112.7(a)(2) or impracticability determinations under 112.7(d); a licensed Professional Engineer must certify each in writing, and this product refers those facilities out. (40 CFR 112.6(b)(4)(i))
- If your state requires it. Compliance with 40 CFR part 112 does not relieve the owner or operator from compliance with other Federal, State, or local laws (40 CFR 112.1(e)). EPA notes that some states do not allow self-certification and advises consulting your state to make sure SPCC Plan certification is not limited to Professional Engineers.
- Farms: the statute sets separate limits for farms; see SPCC for farms.
If you outgrow your tier later (for example, you add a big tank), the rule gives you a deadline to move up: If a change makes any aboveground container larger than 5,000 U.S. gallons or the aggregate aboveground capacity larger than 10,000 U.S. gallons, then within 6 months after preparing the amendment the owner or operator must prepare and implement a Tier II Plan (if the facility still qualifies) or a PE-certified Plan. (40 CFR 112.6(a)(2))
Find out in a few questions whether you need a plan, and which tier
The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.
Start the free eligibility checkDo I need a Professional Engineer?
Not if your facility is a qualified facility: 10,000 gallons or less of aboveground oil storage, and in the past 3 years no single discharge to water over 1,000 gallons and no two over 42 gallons within 12 months (40 CFR 112.3(g)(2)). Farms have their own limits set by statute; see SPCC for farms.
You do need a licensed PE when: your facility is over those limits (40 CFR 112.3(d)); containment is not practicable somewhere and you want to use alternative measures instead (40 CFR 112.6(b)(4)(i)); or your state limits plan certification to engineers. A PE must visit the site (40 CFR 112.3(d)(1)(ii)), so no document tool can replace one. If the free check finds you need a PE, it tells you why and we do not sell you a plan. To find one, look up licensed engineers through your state's engineering licensing board and ask for SPCC experience.
Is a plan made with this tool accepted?
EPA does not pre-approve SPCC plans, and you do not file yours with EPA: you keep it at the facility and show it on request (40 CFR 112.3(e)). What makes a plan acceptable is that it contains every element Part 112 requires for your facility, that it is certified by the right person, and that you actually do what it says. For a qualified facility, the right person is you: the owner or operator may self-certify (40 CFR 112.3(g)).
Our Tier I plans cover every section of EPA's own Appendix G template, with a cross-reference to each template section and each requirement 112.6(a)(3) lists, and Tier II plans include a cross-reference to every applicable paragraph of 112.7 and 112.8. Every requirement in the plan prints its 40 CFR citation, so an inspector can check it against the rule. One caution: Compliance with 40 CFR part 112 does not relieve the owner or operator from compliance with other Federal, State, or local laws (40 CFR 112.1(e)). EPA notes that some states do not allow self-certification and advises consulting your state to make sure SPCC Plan certification is not limited to Professional Engineers.
Related
A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.
Sources cited on this page
Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.
- 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
“| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
- 40 CFR 112.1(d)(2)(ii): Only containers of 55 gallons or more are counted. Checked 2026-11-21.
“For the purposes of this exemption, only containers with a capacity of 55 U.S. gallons or greater are counted.”
- 40 CFR 112.1(d)(2)(ii): Aggregate aboveground oil storage threshold. Checked 2026-11-21.
“The aggregate aboveground storage capacity of the facility is 1,320 U.S. gallons or less of oil.”
- 40 CFR 112.3(d): A PE must certify the Plan unless the facility qualifies under 112.6. Checked 2026-11-21.
“Except as provided in § 112.6, a licensed Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of this part.”
- 40 CFR 112.3(d): Outside the qualified-facility limits a PE must certify. Checked 2026-11-21.
“Except as provided in § 112.6, a licensed Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of this part.”
- 40 CFR 112.3(d)(1)(ii): PE certification includes a site visit by the PE or agent. Checked 2026-11-21.
“That he or his agent has visited and examined the facility;”
- 40 CFR 112.3(e): The Plan is not filed with EPA. Checked 2026-11-21.
“Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan available to the Regional Administrator for on-site review during normal working hours.”
- 40 CFR 112.3(g): Qualified facilities may self-certify. Checked 2026-11-21.
“The owner or operator of a qualified facility as defined in this subparagraph may self-certify his facility's Plan, as provided in § 112.6.”
- 40 CFR 112.3(g)(1): Tier I: no aboveground container over 5,000 gallons. Checked 2026-11-21.
“has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons.”
- 40 CFR 112.3(g)(2): Qualified facility: 10,000 gallons or less aboveground. Checked 2026-11-21.
“and has an aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less.”
- 40 CFR 112.3(g)(2): Qualified facility: no single discharge over 1,000 gallons. Checked 2026-11-21.
“A Tier II qualified facility is one that has had no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons”
- 40 CFR 112.3(g)(2): Qualified facility: no two discharges over 42 gallons within 12 months. Checked 2026-11-21.
“no two discharges as described in § 112.1(b) each exceeding 42 U.S. gallons within any twelve month period in the three years prior to the SPCC Plan self-certification date”
- 40 CFR 112.3(g)(2): Only the oil that reached navigable waters or adjoining shorelines counts toward the 1,000 and 42 gallon tests. Checked 2026-11-22.
“no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons or no two discharges as described in § 112.1(b) each exceeding 42 U.S. gallons”
- 40 CFR 112.3(g)(2): Discharges from natural disasters, war or terrorism do not count. Checked 2026-11-21.
“(other than discharges as described in § 112.1(b) that are the result of natural disasters, acts of war, or terrorism)”
- 40 CFR 112.3(g)(2): Spill-history window for facilities under three years old. Checked 2026-11-21.
“or since becoming subject to this part if the facility has been in operation for less than three years”
- 40 CFR 112.6(a)(1): Tier I options: template, Tier II plan, or PE plan. Checked 2026-11-21.
“If you do not follow the appendix G template, you must prepare an equivalent Plan that meets all of the applicable requirements listed in this part, and you must supplement it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in the other prevention plan.”
- 40 CFR 112.6(a)(1)(vii): Tier I: impracticability is not available. Checked 2026-11-21.
“The Plan does not deviate from any requirement of this part as allowed by § 112.7(a)(2) and 112.7(d) or include measures pursuant to § 112.9(c)(6) for produced water containers and any associated piping; and”
- 40 CFR 112.6(a)(2): Tier I: facility outgrows Tier I. Checked 2026-11-21.
“If the facility change results in the facility no longer meeting the Tier I qualifying criteria in § 112.3(g)(1) because an individual oil storage container capacity exceeds 5,000 U.S. gallons or the facility capacity exceeds 10,000 U.S. gallons in aggregate aboveground storage capacity, within six months following preparation of the amendment, you must either:”
- 40 CFR 112.6(a)(3): Tier I Plans do not require a facility diagram. Checked 2026-11-21.
“introductory paragraph of §§ 112.7, 112.7(a)(3)(i), 112.7(a)(3)(iv), 112.7(a)(3)(vi), 112.7(a)(4), 112.7(a)(5), 112.7(c), 112.7(e), 112.7(f), 112.7(g), 112.7(k)”
- 40 CFR 112.6(a)(3)(ii): Bulk storage and mobile containers: largest container plus precipitation (Tier I). Checked 2026-11-21.
“Construct all bulk storage container installations (except mobile refuelers and other non-transportation-related tank trucks), including mobile or portable oil storage containers, so that you provide a secondary means of containment for the entire capacity of the largest single container plus additional capacity to contain precipitation.”
- 40 CFR 112.6(a)(3)(iii): Tier I: overfill prevention system or documented procedure. Checked 2026-11-21.
“Ensure that each container is provided with a system or documented procedure to prevent overfills of the container, describe the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy.”
- 40 CFR 112.6(b)(1): Tier II facilities may choose to self-certify. Checked 2026-11-21.
“If you are the owner or operator of a facility that meets the Tier II qualified facility criteria in § 112.3(g)(2), you may choose to self-certify your Plan.”
- 40 CFR 112.6(b)(3): Tier II Plan must meet 112.7 and the applicable requirements of subparts B and C. Checked 2026-11-21.
“Except as provided in this paragraph, your self-certified SPCC Plan must comply with § 112.7 and the applicable requirements in subparts B and C of this part:”
- 40 CFR 112.6(b)(3)(ii): Tier II: impracticability only with a PE-certified portion. Checked 2026-11-21.
“Your Plan may not include any determinations that secondary containment is impracticable and provisions in lieu of secondary containment pursuant to § 112.7(d), unless each such determination and alternate measure has been reviewed and certified in writing by a Professional Engineer”
- 40 CFR 112.6(b)(4)(i): PE-certified portions (hybrid Plan) are outside this product. Checked 2026-11-21.
“As described in paragraph (b)(3) of this section, the facility owner or operator may not self-certify alternative measures allowed under § 112.7(a)(2) or (d), that are included in the facility's Plan. Such measures must be reviewed and certified, in writing, by a licensed Professional Engineer.”
- 40 CFR 112.7: Cross-reference table if the Plan does not follow 112.7's sequence. Checked 2026-11-21.
“If you do not follow the sequence specified in this section for the Plan, you must prepare an equivalent Plan acceptable to the Regional Administrator that meets all of the applicable requirements listed in this part, and you must supplement it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in the other prevention plan.”
- 40 CFR 112.7(a)(3): Physical layout and facility diagram. Checked 2026-11-21.
“Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located.”
- 40 CFR 112.7(a)(3)(iii): Discharge or drainage controls. Checked 2026-11-21.
“Discharge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge;”
- 40 CFR 112.7(b): Tier II: direction, rate of flow and quantity of potential discharges. Checked 2026-11-21.
“include in your Plan a prediction of the direction, rate of flow, and total quantity of oil which could be discharged from the facility as a result of each type of major equipment failure.”
- 40 CFR 112.7(f)(3): What each briefing covers. Checked 2026-11-21.
“Such briefings must highlight and describe known discharges as described in § 112.1(b) or failures, malfunctioning components, and any recently developed precautionary measures.”
- 40 CFR 112.8(c)(2): Bulk storage: largest container plus freeboard for precipitation (Tier II). Checked 2026-11-21.
“Construct all bulk storage tank installations (except mobile refuelers and other non-transportation-related tank trucks) so that you provide a secondary means of containment for the entire capacity of the largest single container and sufficient freeboard to contain precipitation.”
- 40 CFR 112.8(c)(8): Tier II: at least one overfill prevention device per container installation. Checked 2026-11-21.
“Engineer or update each container installation in accordance with good engineering practice to avoid discharges. You must provide at least one of the following devices:”
- 40 CFR Part 112 Appendix G: III.1 Oil Storage Containers (Table G-2). Checked 2026-11-21.
“1. Oil Storage Containers (§112.7(a)(3)(i)):”
- EPA web page: Is My Facility a "Qualified Facility" under the SPCC Rule?: Some states do not allow self-certification. Checked 2026-11-22.
“However, please note that some states do not allow self-certification. You should consult with your state to ensure that SPCC Plan certification is not limited to PEs.”
- EPA 2023 SPCC Expedited Settlement form (2023): $1,750.
“Failure to have a Spill Prevention Control and Countermeasure Plan 112.3 ($1,750)”