Free printable, 40 CFR 112.7(e) and 112.8(c)(6)
SPCC inspection checklist
The items below are what a monthly SPCC inspection covers, each with the rule it comes from. Enter your email to get the printable version with sign-off boxes.
Get the printable checklist
How often
Under EPA's Tier I template, the minimum schedule for most small containers is a monthly visual inspection:
- Portable containers (including drums, totes, and intermodal bulk containers (IBC)): visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas. (40 CFR Part 112 Appendix G)
- Containers of 55 to 1,100 gallons with sized secondary containment: visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements required by the industry inspection standard. (40 CFR Part 112 Appendix G)
- Containers of 1,101 to 5,000 gallons with sized secondary containment and no method of leak detection: visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements and other specific integrity tests required by the industry inspection standard. (40 CFR Part 112 Appendix G)
For Tier II plans the rule itself says "frequently" and the plan sets the interval: 40 CFR 112.8(c)(6) requires frequent inspection of the outside of each container. Under this Plan, and consistent with the industry standard named for each container, qualified facility personnel visually inspect the outside of each aboveground bulk storage container, its supports and foundations, and its diked area for signs of deterioration, discharges, or accumulation of oil at least every 1 month(s), or more often where the named standard requires, and record the result in the inspection log. (40 CFR 112.8(c)(6))
What the monthly inspection covers
Every container (monthly)
- Outside of the container: no rust, dents, bulges, cracks, weeping seams or leaks (40 CFR 112.8(c)(6), 40 CFR Part 112 Appendix G)
- Inside the dike, curb or pallet: no oil or sheen collected (40 CFR 112.8(c)(6))
- Supports and foundation: sound, no settling or cracking (40 CFR 112.8(c)(6))
- Visible leaks from seams, gaskets, valves, pumps or bolts: none, or fixed now (40 CFR 112.8(c)(10))
Double-wall tanks
- Interstitial space checked (port, drain plug, sensor or indicator): no oil (40 CFR 112.8(c)(6))
Piping, valves and transfer equipment
- Aboveground valves, piping, flanges, catch pans and supports: good condition (40 CFR 112.8(d)(4))
- Master flow and drain valves locked closed when not in use (40 CFR 112.7(g))
- Out-of-service connections capped or blank-flanged and marked (40 CFR 112.8(d)(2))
Overfill protection
- High-level alarm, gauge or cutoff tested and working (at the interval in your plan) (40 CFR 112.8(c)(8)(v))
Diked areas with drain valves
- Bypass valve sealed closed; before draining rainwater, no oil or sheen; drainage logged (40 CFR 112.8(c)(3))
Record
- Inspector signs and dates this sheet; keep it with the plan for the required period (40 CFR 112.7(e), 40 CFR 112.7(e))
Beyond the monthly check
- Shop-built tanks also need the formal inspections and tests of an industry standard. This Plan uses STI SP001, Standard for the Inspection of Aboveground Storage Tanks, as the industry standard for inspecting and testing its shop-built aboveground containers that are within the scope of that standard. As EPA's guidance describes the standard, it assigns each tank a category based on its size, whether it is in contact with the ground, whether it has secondary containment or spill control, and whether it has a continuous release detection method; the category sets the type and frequency of the owner's periodic inspections and of formal external and internal inspections by a certified inspector. Formal inspection intervals: per industry standard (STI SP001 category for this container). (40 CFR 112.8(c)(6))
- Integrity testing on a regular schedule and after repairs: Each aboveground bulk storage container is tested or inspected for integrity on a regular schedule and whenever material repairs are made. (40 CFR 112.8(c)(6))
- Buried piping when exposed: If a section of buried line is exposed for any reason, it is carefully inspected for deterioration, and corrosion damage leads to additional examination and corrective action as the damage warrants. (40 CFR 112.8(d)(1))
Keeping the records
- Inspections and tests required by Part 112 are conducted in accordance with written procedures developed for the facility (the inspection checklists attached to this Plan). (40 CFR 112.7(e))
- The written procedures and a record of each inspection and test, signed by the appropriate supervisor or inspector, are kept with the SPCC Plan for at least 3 years. EPA recommends keeping formal integrity test reports for the life of the container. (40 CFR 112.7(e))
- Records of inspections and tests kept under usual and customary business practices satisfy the recordkeeping requirement. (40 CFR 112.7(e))
An inspector can ask to see these records on the day. The plan with a year of logs and updates sends the monthly reminder and keeps the log for you.
Find out in a few questions whether you need a plan, and which tier
The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.
Start the free eligibility checkRelated
A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.
Sources cited on this page
Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.
- 40 CFR 112.7(e): Inspection records are signed. Checked 2026-11-21.
“signed by the appropriate supervisor or inspector”
- 40 CFR 112.7(e): Keep signed inspection records with the Plan for three years. Checked 2026-11-21.
“You must keep these written procedures and a record of the inspections and tests, signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years.”
- 40 CFR 112.7(e): Inspections follow written procedures. Checked 2026-11-21.
“Conduct inspections and tests required by this part in accordance with written procedures that you or the certifying engineer develop for the facility.”
- 40 CFR 112.7(e): Usual business records suffice. Checked 2026-11-21.
“Records of inspections and tests kept under usual and customary business practices will suffice for purposes of this paragraph.”
- 40 CFR 112.7(g): Secure master flow and drain valves. Checked 2026-11-21.
“secure master flow and drain valves”
- 40 CFR 112.8(c)(3): Draining rainwater from diked areas. Checked 2026-11-21.
“Not allow drainage of uncontaminated rainwater from the diked area into a storm drain or discharge of an effluent into an open watercourse, lake, or pond, bypassing the facility treatment system unless you: (i) Normally keep the bypass valve sealed closed. (ii) Inspect the retained rainwater to ensure that its presence will not cause a discharge as described in ยง 112.1(b). (iii) Open the bypass valve and reseal it following drainage under responsible supervision; and (iv) Keep adequate records of such events”
- 40 CFR 112.8(c)(6): Owner visual inspection at least monthly (Tier II schedule; product choice per guidance). Checked 2026-11-21.
“In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
- 40 CFR 112.8(c)(6): Frequent visual inspection of container outsides and diked areas. Checked 2026-11-21.
“In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
- 40 CFR 112.8(c)(6): Comparison records; inspect supports and foundations. Checked 2026-11-21.
“You must keep comparison records and you must also inspect the container's supports and foundations.”
- 40 CFR 112.8(c)(6): Double-wall tanks: inspect the interstitial space. Checked 2026-11-21.
“In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
- 40 CFR 112.8(c)(6): Shop-built containers: STI SP001 where the Plan names it. Checked 2026-11-21.
“You must determine, in accordance with industry standards, the appropriate qualifications for personnel performing tests and inspections, the frequency and type of testing and inspections”
- 40 CFR 112.8(c)(6): Integrity test or inspect each aboveground container on a regular schedule. Checked 2026-11-21.
“Test or inspect each aboveground container for integrity on a regular schedule and whenever you make material repairs.”
- 40 CFR 112.8(c)(8)(v): Regularly test liquid level sensing devices. Checked 2026-11-21.
“You must regularly test liquid level sensing devices to ensure proper operation.”
- 40 CFR 112.8(c)(10): Promptly correct visible leaks and remove oil in diked areas. Checked 2026-11-21.
“Promptly correct visible discharges which result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts. You must promptly remove any accumulations of oil in diked areas.”
- 40 CFR 112.8(d)(1): Inspect buried piping whenever it is exposed. Checked 2026-11-21.
“If a section of buried line is exposed for any reason, you must carefully inspect it for deterioration. If you find corrosion damage, you must undertake additional examination and corrective action as indicated by the magnitude of the damage.”
- 40 CFR 112.8(d)(2): Cap or blank-flange idle transfer connections. Checked 2026-11-21.
“Cap or blank-flange the terminal connection at the transfer point and mark it as to origin when piping is not in service or is in standby service for an extended time.”
- 40 CFR 112.8(d)(4): Regularly inspect aboveground valves, piping and appurtenances. Checked 2026-11-21.
“Regularly inspect all aboveground valves, piping, and appurtenances. During the inspection you must assess the general condition of items, such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces.”
- 40 CFR Part 112 Appendix G: Tier I: portable containers (drums, totes, IBCs) visual monthly. Checked 2026-11-21.
“Portable containers (including drums, totes, and”
- 40 CFR Part 112 Appendix G: Tier I: 55 to 1,100 gallons with sized containment. Checked 2026-11-21.
“55 to 1,100 gallons with sized secondary containment”
- 40 CFR Part 112 Appendix G: Tier I: 1,101 to 5,000 gallons with sized containment and no leak detection. Checked 2026-11-21.
“containment and no method of leak detection^a^”