SPCC inspection checklist

The items below are what a monthly SPCC inspection covers, each with the rule it comes from. Enter your email to get the printable version with sign-off boxes.

Get the printable checklist

We email you the link to the printable checklist. We do not share your address. See our privacy page.

How often

Under EPA's Tier I template, the minimum schedule for most small containers is a monthly visual inspection:

  • Portable containers (including drums, totes, and intermodal bulk containers (IBC)): visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas. (40 CFR Part 112 Appendix G)
  • Containers of 55 to 1,100 gallons with sized secondary containment: visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements required by the industry inspection standard. (40 CFR Part 112 Appendix G)
  • Containers of 1,101 to 5,000 gallons with sized secondary containment and no method of leak detection: visually inspect every 1 month(s) for signs of deterioration, discharges or accumulation of oil inside diked areas, plus any annual inspection elements and other specific integrity tests required by the industry inspection standard. (40 CFR Part 112 Appendix G)

For Tier II plans the rule itself says "frequently" and the plan sets the interval: 40 CFR 112.8(c)(6) requires frequent inspection of the outside of each container. Under this Plan, and consistent with the industry standard named for each container, qualified facility personnel visually inspect the outside of each aboveground bulk storage container, its supports and foundations, and its diked area for signs of deterioration, discharges, or accumulation of oil at least every 1 month(s), or more often where the named standard requires, and record the result in the inspection log. (40 CFR 112.8(c)(6))

What the monthly inspection covers

Every container (monthly)

Double-wall tanks

Piping, valves and transfer equipment

Overfill protection

Diked areas with drain valves

Record

Beyond the monthly check

Keeping the records

An inspector can ask to see these records on the day. The plan with a year of logs and updates sends the monthly reminder and keeps the log for you.

Find out in a few questions whether you need a plan, and which tier

The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.

Start the free eligibility check

Related

A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.

Sources cited on this page

Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.

  • 40 CFR 112.7(e): Inspection records are signed. Checked 2026-11-21.
    “signed by the appropriate supervisor or inspector”
  • 40 CFR 112.7(e): Keep signed inspection records with the Plan for three years. Checked 2026-11-21.
    “You must keep these written procedures and a record of the inspections and tests, signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years.”
  • 40 CFR 112.7(e): Inspections follow written procedures. Checked 2026-11-21.
    “Conduct inspections and tests required by this part in accordance with written procedures that you or the certifying engineer develop for the facility.”
  • 40 CFR 112.7(e): Usual business records suffice. Checked 2026-11-21.
    “Records of inspections and tests kept under usual and customary business practices will suffice for purposes of this paragraph.”
  • 40 CFR 112.7(g): Secure master flow and drain valves. Checked 2026-11-21.
    “secure master flow and drain valves”
  • 40 CFR 112.8(c)(3): Draining rainwater from diked areas. Checked 2026-11-21.
    “Not allow drainage of uncontaminated rainwater from the diked area into a storm drain or discharge of an effluent into an open watercourse, lake, or pond, bypassing the facility treatment system unless you: (i) Normally keep the bypass valve sealed closed. (ii) Inspect the retained rainwater to ensure that its presence will not cause a discharge as described in ยง 112.1(b). (iii) Open the bypass valve and reseal it following drainage under responsible supervision; and (iv) Keep adequate records of such events”
  • 40 CFR 112.8(c)(6): Owner visual inspection at least monthly (Tier II schedule; product choice per guidance). Checked 2026-11-21.
    “In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
  • 40 CFR 112.8(c)(6): Frequent visual inspection of container outsides and diked areas. Checked 2026-11-21.
    “In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
  • 40 CFR 112.8(c)(6): Comparison records; inspect supports and foundations. Checked 2026-11-21.
    “You must keep comparison records and you must also inspect the container's supports and foundations.”
  • 40 CFR 112.8(c)(6): Double-wall tanks: inspect the interstitial space. Checked 2026-11-21.
    “In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
  • 40 CFR 112.8(c)(6): Shop-built containers: STI SP001 where the Plan names it. Checked 2026-11-21.
    “You must determine, in accordance with industry standards, the appropriate qualifications for personnel performing tests and inspections, the frequency and type of testing and inspections”
  • 40 CFR 112.8(c)(6): Integrity test or inspect each aboveground container on a regular schedule. Checked 2026-11-21.
    “Test or inspect each aboveground container for integrity on a regular schedule and whenever you make material repairs.”
  • 40 CFR 112.8(c)(8)(v): Regularly test liquid level sensing devices. Checked 2026-11-21.
    “You must regularly test liquid level sensing devices to ensure proper operation.”
  • 40 CFR 112.8(c)(10): Promptly correct visible leaks and remove oil in diked areas. Checked 2026-11-21.
    “Promptly correct visible discharges which result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts. You must promptly remove any accumulations of oil in diked areas.”
  • 40 CFR 112.8(d)(1): Inspect buried piping whenever it is exposed. Checked 2026-11-21.
    “If a section of buried line is exposed for any reason, you must carefully inspect it for deterioration. If you find corrosion damage, you must undertake additional examination and corrective action as indicated by the magnitude of the damage.”
  • 40 CFR 112.8(d)(2): Cap or blank-flange idle transfer connections. Checked 2026-11-21.
    “Cap or blank-flange the terminal connection at the transfer point and mark it as to origin when piping is not in service or is in standby service for an extended time.”
  • 40 CFR 112.8(d)(4): Regularly inspect aboveground valves, piping and appurtenances. Checked 2026-11-21.
    “Regularly inspect all aboveground valves, piping, and appurtenances. During the inspection you must assess the general condition of items, such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces.”
  • 40 CFR Part 112 Appendix G: Tier I: portable containers (drums, totes, IBCs) visual monthly. Checked 2026-11-21.
    “Portable containers (including drums, totes, and”
  • 40 CFR Part 112 Appendix G: Tier I: 55 to 1,100 gallons with sized containment. Checked 2026-11-21.
    “55 to 1,100 gallons with sized secondary containment”
  • 40 CFR Part 112 Appendix G: Tier I: 1,101 to 5,000 gallons with sized containment and no leak detection. Checked 2026-11-21.
    “containment and no method of leak detection^a^”