Home / SPCC plan template
SPCC plan template, filled in for your site: containment sized and inspections scheduled
EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).
Not a blank download: you answer questions about your own tanks, drums and totes, and see your plan before you pay. EPA's own template is free, and we link to it below. EPA estimates about four hours of staff time to fill it in (EPA SPCC ICR (2020 renewal), Exhibit A-6, 2018 dollars (2018)); this tool also checks your containment arithmetic, which the blank template leaves to you.
An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.
- Free eligibility check first
- Editable DOCX and PDF
- Every requirement cited to 40 CFR
- Missing-element guarantee, plus 30 days no questions asked
The honest answer first
EPA publishes a free SPCC plan template for Tier I qualified facilities. It is Appendix G to Part 112, and EPA offers it as an editable Word file on its Tier I template page. If your facility qualifies, you can fill it in and sign it yourself, and that is a complete plan (40 CFR 112.6(a)(1)). You do not have to buy anything.
Who can use it: The facility has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons. (40 CFR 112.3(g)(1)), plus the Tier II limits: The facility's aggregate aboveground oil storage capacity is 10,000 U.S. gallons or less. (40 CFR 112.3(g)(2)) and a clean spill history (40 CFR 112.3(g)(2)). If any container is over 5,000 gallons, the template is not for you; you need a Tier II plan.
Where people get stuck
- Table G-4, containment. You must state that each area has containment and, for bulk containers, that it holds the largest container plus rain (40 CFR 112.6(a)(3)(ii)). The template does not do the calculation for you; you need the dike dimensions and the arithmetic, including the space other tanks take up (EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22).
- Table G-5 and G-17, inspections. You pick an industry standard and a schedule for each container type: Each shop-built aboveground bulk storage container is inspected or tested on a regular schedule in accordance with a recognized container inspection standard, meeting at least the minimum requirements in the Bulk Storage Container Inspection Schedule (Table G-17). (40 CFR Part 112 Appendix G)
- Overfill prevention. Each container has a system or documented procedure to prevent overfills, described in this Plan, and it is regularly tested to ensure proper operation or efficacy. (40 CFR 112.6(a)(3)(iii)) The template leaves you to write the procedure.
- Double-wall tanks. A shop like an auto or equipment shop often has a double-wall used-oil tank and assumes the second wall is its containment. EPA's inspector guidance treats a shop-built double-wall tank as its own containment only under listed conditions, including an overfill alarm and an automatic flow restrictor or shut-off (EPA SPCC Guidance for Regional Inspectors sec. 4.4.5, pp. 4-37 to 4-38). The blank template lets you tick "adequate" without checking them; this tool asks.
- Section I, certification. You attest to eight statements, including that you visited the facility and that it meets the qualification criteria (40 CFR Part 112 Appendix G).
- Attachments. The five-year review log, amendment log, inspection log, dike drainage log, training log and discharge notification form are blank tables you complete over time (40 CFR Part 112 Appendix G).

What our tool adds to the template
| Task | EPA template | This tool |
|---|---|---|
| Do I qualify for Tier I? | You decide from the rule | Free check from your container list and spill history, with the rule cited |
| Containment sizing | You state it is adequate | Calculated per container, with the arithmetic printed and shortfalls flagged |
| Inspection schedule | You fill in Table G-5 | Set per container type from Table G-17 and the standard for shop-built tanks |
| Procedures (transfers, overfill, response) | Blank text fields | Written from your transfer areas and equipment |
| Facility diagram | Not included (not required) | Drawn on your site photo or a grid |
| Checklists, logs, contact sheet | Blank tables | Printable, filled with your containers and contacts |
| Citations | Not included | Every requirement cited to its CFR paragraph, with the date checked |
| Reminders | None | Monthly, annual and five-year reminders with the plan plus a year |
| Price | Free | $299 one time |
EPA's own estimate of the work: about four hours of staff time to prepare a plan with the template, for a typical Tier I facility (EPA SPCC ICR (2020 renewal), Exhibit A-6, 2018 dollars (2018)), but that assumes you already know your containment numbers and inspection standard. See exactly what you would get on the sample plan page.
What an inspector checks, and where it is in the plan
The template's sections are EPA's layout. An inspector looks for the elements the rule requires; here are the first few, with where each sits in the plan this tool writes.
| What they check | Required by | Section of your plan | Plans |
|---|---|---|---|
| Signed certification by the owner or operator | Qualified facilities may self-certify 40 CFR 112.3(g), 40 CFR 112.6(a)(1)(ii) | Self-certification | Tier I and II |
| Management approval to commit resources | Full approval of management 40 CFR 112.7 | Self-certification | Tier I and II |
| Facility name, address and owner | Facility Description 40 CFR Part 112 Appendix G | Facility information | Tier I and II |
See all 21 elements an inspector checks, each with the section of your plan that covers it.
What the template asks for, section by section
| Template section | Our plan section | Source |
|---|---|---|
| Template preamble | Cover | 40 CFR Part 112 Appendix G |
| Facility Description | Facility information | 40 CFR Part 112 Appendix G |
| I. Self-Certification Statement | Self-certification | 40 CFR Part 112 Appendix G |
| II. Record of Plan Review and Amendments | Five-year review and amendment log | 40 CFR Part 112 Appendix G |
| III.1 Oil Storage Containers (Table G-2) | Oil storage containers | 40 CFR Part 112 Appendix G |
| III.2 Secondary Containment and Oil Spill Control (Tables G-3, G-4) | Secondary containment | 40 CFR Part 112 Appendix G |
| III.3 Inspections, Testing, Recordkeeping and Personnel Training (Table G-5) | Inspections and testing | 40 CFR Part 112 Appendix G |
| III.4 Security (Table G-6) | Security | 40 CFR Part 112 Appendix G |
| III.5 Emergency Procedures and Notifications (Table G-7) | Discharge response and notification | 40 CFR Part 112 Appendix G |
| III.6 Contact List (Table G-8) | Emergency contacts | 40 CFR Part 112 Appendix G |
| III.7 NRC Notification Procedure (Table G-9) | Discharge response and notification | 40 CFR Part 112 Appendix G |
| III.8 SPCC Spill Reporting Requirements (60 days) | Discharge response and notification | 40 CFR Part 112 Appendix G |
| A. Onshore Facilities (excluding production) (Table G-10) | Secondary containment | 40 CFR Part 112 Appendix G |
| B. Onshore Oil Production Facilities (Table G-11) | Secondary containment | 40 CFR Part 112 Appendix G |
| C. Onshore Oil Drilling and Workover Facilities (Table G-12) | Secondary containment | 40 CFR Part 112 Appendix G |
| Attachment 1.1 Five Year Review Log (Table G-13) | Five-year review and amendment log | 40 CFR Part 112 Appendix G |
| Attachment 1.2 Technical Amendment Log (Table G-14) | Five-year review and amendment log | 40 CFR Part 112 Appendix G |
| Attachment 2 Oil Spill Contingency Plan and Checklist (Table G-15) | Inspection checklists | 40 CFR Part 112 Appendix G |
| Attachment 3.1 Inspection Log and Schedule (Table G-16) | Inspection checklists | 40 CFR Part 112 Appendix G |
| Attachment 3.2 Bulk Storage Container Inspection Schedule (Table G-17) | Inspections and testing | 40 CFR Part 112 Appendix G |
| Attachment 3.3 Dike Drainage Log (Table G-18) | Inspection checklists | 40 CFR Part 112 Appendix G |
| Attachment 3.4 Oil-handling Personnel Training and Briefing Log (Table G-19) | Training and briefing log | 40 CFR Part 112 Appendix G |
| Attachment 4 Discharge Notification Form (Table G-20) | Spill-response contact sheet | 40 CFR Part 112 Appendix G |
Find out in a few questions whether you need a plan, and which tier
The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.
Start the free eligibility checkEPA's Tier I template is free. Why pay?
It is free, and if your facility qualifies for Tier I you can fill it in yourself (40 CFR 112.6(a)(1)). What you pay us for is the work around it: deciding whether you qualify, sizing containment for each container with the arithmetic shown, choosing the right inspection schedule for each container type, writing procedures specific to your transfer areas, a diagram, and the checklists, logs and contact sheet ready to print. If you would rather do that yourself, use EPA's template; our template guide explains how.
Is a plan made with this tool accepted?
EPA does not pre-approve SPCC plans, and you do not file yours with EPA: you keep it at the facility and show it on request (40 CFR 112.3(e)). What makes a plan acceptable is that it contains every element Part 112 requires for your facility, that it is certified by the right person, and that you actually do what it says. For a qualified facility, the right person is you: the owner or operator may self-certify (40 CFR 112.3(g)).
Our Tier I plans cover every section of EPA's own Appendix G template, with a cross-reference to each template section and each requirement 112.6(a)(3) lists, and Tier II plans include a cross-reference to every applicable paragraph of 112.7 and 112.8. Every requirement in the plan prints its 40 CFR citation, so an inspector can check it against the rule. One caution: Compliance with 40 CFR part 112 does not relieve the owner or operator from compliance with other Federal, State, or local laws (40 CFR 112.1(e)). EPA notes that some states do not allow self-certification and advises consulting your state to make sure SPCC Plan certification is not limited to Professional Engineers.
Do I need a Professional Engineer?
Not if your facility is a qualified facility: 10,000 gallons or less of aboveground oil storage, and in the past 3 years no single discharge to water over 1,000 gallons and no two over 42 gallons within 12 months (40 CFR 112.3(g)(2)). Farms have their own limits set by statute; see SPCC for farms.
You do need a licensed PE when: your facility is over those limits (40 CFR 112.3(d)); containment is not practicable somewhere and you want to use alternative measures instead (40 CFR 112.6(b)(4)(i)); or your state limits plan certification to engineers. A PE must visit the site (40 CFR 112.3(d)(1)(ii)), so no document tool can replace one. If the free check finds you need a PE, it tells you why and we do not sell you a plan. To find one, look up licensed engineers through your state's engineering licensing board and ask for SPCC experience.
Related
A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.
Sources cited on this page
Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.
- 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
“| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
- 40 CFR 112.3(d): A PE must certify the Plan unless the facility qualifies under 112.6. Checked 2026-11-21.
“Except as provided in § 112.6, a licensed Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of this part.”
- 40 CFR 112.3(d)(1)(ii): PE certification includes a site visit by the PE or agent. Checked 2026-11-21.
“That he or his agent has visited and examined the facility;”
- 40 CFR 112.3(e): The Plan is not filed with EPA. Checked 2026-11-21.
“Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan available to the Regional Administrator for on-site review during normal working hours.”
- 40 CFR 112.3(g): Qualified facilities may self-certify. Checked 2026-11-21.
“The owner or operator of a qualified facility as defined in this subparagraph may self-certify his facility's Plan, as provided in § 112.6.”
- 40 CFR 112.3(g)(1): Tier I: no aboveground container over 5,000 gallons. Checked 2026-11-21.
“has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons.”
- 40 CFR 112.3(g)(2): Qualified facility: 10,000 gallons or less aboveground. Checked 2026-11-21.
“and has an aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less.”
- 40 CFR 112.3(g)(2): Qualified facility: no single discharge over 1,000 gallons. Checked 2026-11-21.
“A Tier II qualified facility is one that has had no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons”
- 40 CFR 112.3(g)(2): Qualified facility: no two discharges over 42 gallons within 12 months. Checked 2026-11-21.
“no two discharges as described in § 112.1(b) each exceeding 42 U.S. gallons within any twelve month period in the three years prior to the SPCC Plan self-certification date”
- 40 CFR 112.6(a)(1): Tier I options: template, Tier II plan, or PE plan. Checked 2026-11-21.
“If you do not follow the appendix G template, you must prepare an equivalent Plan that meets all of the applicable requirements listed in this part, and you must supplement it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in the other prevention plan.”
- 40 CFR 112.6(a)(1)(ii): The certifying owner or operator visits and examines the facility (personally, per EPA's FAQ). Checked 2026-11-21.
“You have visited and examined the facility;”
- 40 CFR 112.6(a)(3)(ii): Bulk storage and mobile containers: largest container plus precipitation (Tier I). Checked 2026-11-21.
“Construct all bulk storage container installations (except mobile refuelers and other non-transportation-related tank trucks), including mobile or portable oil storage containers, so that you provide a secondary means of containment for the entire capacity of the largest single container plus additional capacity to contain precipitation.”
- 40 CFR 112.6(a)(3)(iii): Tier I: overfill prevention system or documented procedure. Checked 2026-11-21.
“Ensure that each container is provided with a system or documented procedure to prevent overfills of the container, describe the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy.”
- 40 CFR 112.6(b)(4)(i): PE-certified portions (hybrid Plan) are outside this product. Checked 2026-11-21.
“As described in paragraph (b)(3) of this section, the facility owner or operator may not self-certify alternative measures allowed under § 112.7(a)(2) or (d), that are included in the facility's Plan. Such measures must be reviewed and certified, in writing, by a licensed Professional Engineer.”
- 40 CFR 112.7: Full approval of management. Checked 2026-11-21.
“The Plan must have the full approval of management at a level of authority to commit the necessary resources to fully implement the Plan.”
- 40 CFR Part 112 Appendix G: Tier I: inspect shop-built containers per a recognized standard, at least Table G-17. Checked 2026-11-21.
“To comply with integrity inspection requirement for bulk storage containers, inspect/test each shop-built aboveground bulk storage container on a regular schedule in accordance with a recognized container inspection standard based on the minimum requirements in the following table.”
- 40 CFR Part 112 Appendix G: I. Self-Certification Statement. Checked 2026-11-21.
“I. Self-Certification Statement (§112.6(a)(1))”
- 40 CFR Part 112 Appendix G: Attachment 1.1 Five Year Review Log (Table G-13). Checked 2026-11-21.
“ATTACHMENT 1.1 - Five Year Review Log”
- 40 CFR Part 112 Appendix G: Facility Description. Checked 2026-11-21.
“Facility Description Facility Name Facility Address”
- 40 CFR Part 112 Appendix G: Template preamble. Checked 2026-11-21.
“This template constitutes the SPCC Plan for the facility, when completed and signed by the owner or operator of a facility that meets the applicability criteria in §112.3(g)(1).”
- 40 CFR Part 112 Appendix G: II. Record of Plan Review and Amendments. Checked 2026-11-21.
“II. Record of Plan Review and Amendments”
- 40 CFR Part 112 Appendix G: III.1 Oil Storage Containers (Table G-2). Checked 2026-11-21.
“1. Oil Storage Containers (§112.7(a)(3)(i)):”
- 40 CFR Part 112 Appendix G: III.2 Secondary Containment and Oil Spill Control (Tables G-3, G-4). Checked 2026-11-21.
“2. Secondary Containment and Oil Spill Control (§§112.6(a)(3)(i) and (ii), 112.7(c) and 112.9(c)(2)):”
- 40 CFR Part 112 Appendix G: III.3 Inspections, Testing, Recordkeeping and Personnel Training (Table G-5). Checked 2026-11-21.
“3. Inspections, Testing, Recordkeeping and Personnel Training (§§112.7(e) and (f), 112.8(c)(6) and (d)(4), 112.9(c)(3), 112.12(c)(6) and (d)(4)):”
- 40 CFR Part 112 Appendix G: III.4 Security (Table G-6). Checked 2026-11-21.
“4. Security (excluding oil production facilities) §112.7(g):”
- 40 CFR Part 112 Appendix G: III.5 Emergency Procedures and Notifications (Table G-7). Checked 2026-11-21.
“5. Emergency Procedures and Notifications (§112.7(a)(3)(iv) and 112.7(a)(5)):”
- 40 CFR Part 112 Appendix G: III.6 Contact List (Table G-8). Checked 2026-11-21.
“6. Contact List (§112.7(a)(3)(vi)):”
- 40 CFR Part 112 Appendix G: III.7 NRC Notification Procedure (Table G-9). Checked 2026-11-21.
“7. NRC Notification Procedure (§112.7(a)(4) and (a)(5)):”
- 40 CFR Part 112 Appendix G: III.8 SPCC Spill Reporting Requirements (60 days). Checked 2026-11-21.
“8. SPCC Spill Reporting Requirements (Report within 60 days) (§112.4):”
- 40 CFR Part 112 Appendix G: A. Onshore Facilities (excluding production) (Table G-10). Checked 2026-11-21.
“A. Onshore Facilities (excluding production) (§§112.8(b) through (d), 112.12(b) through (d)):”
- 40 CFR Part 112 Appendix G: B. Onshore Oil Production Facilities (Table G-11). Checked 2026-11-21.
“B. Onshore Oil Production Facilities (excluding drilling and workover facilities)”
- 40 CFR Part 112 Appendix G: C. Onshore Oil Drilling and Workover Facilities (Table G-12). Checked 2026-11-21.
“C. Onshore Oil Drilling and Workover Facilities (§112.10(b), (c) and (d)):”
- 40 CFR Part 112 Appendix G: Attachment 1.2 Technical Amendment Log (Table G-14). Checked 2026-11-21.
“ATTACHMENT 1.2 - Technical Amendment Log”
- 40 CFR Part 112 Appendix G: Attachment 2 Oil Spill Contingency Plan and Checklist (Table G-15). Checked 2026-11-21.
“ATTACHMENT 2 - Oil Spill Contingency Plan and Checklist”
- 40 CFR Part 112 Appendix G: Attachment 3.1 Inspection Log and Schedule (Table G-16). Checked 2026-11-21.
“ATTACHMENT 3.1 - Inspection Log and Schedule”
- 40 CFR Part 112 Appendix G: Attachment 3.2 Bulk Storage Container Inspection Schedule (Table G-17). Checked 2026-11-21.
“ATTACHMENT 3.2 - Bulk Storage Container Inspection Schedule - onshore facilities”
- 40 CFR Part 112 Appendix G: Attachment 3.3 Dike Drainage Log (Table G-18). Checked 2026-11-21.
“ATTACHMENT 3.3 - Dike Drainage Log”
- 40 CFR Part 112 Appendix G: Attachment 3.4 Oil-handling Personnel Training and Briefing Log (Table G-19). Checked 2026-11-21.
“ATTACHMENT 3.4 - Oil-handling Personnel Training and Briefing Log”
- 40 CFR Part 112 Appendix G: Attachment 4 Discharge Notification Form (Table G-20). Checked 2026-11-21.
“ATTACHMENT 4 - Discharge Notification Form”
- EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22: Containment sizing calculation (EPA guidance method). Checked 2026-11-21.
“A “110 percent of storage tank capacity” rule of thumb may be an acceptable design criterion in many situations”
- EPA SPCC Guidance for Regional Inspectors sec. 4.4.5, pp. 4-37 to 4-38: Shop-built double-wall tanks as secondary containment. Checked 2026-11-21.
“Shop-fabricated double-wall ASTs, regardless of size, may generally satisfy not only the secondary containment requirements of §112.7(c), but also the specific secondary containment requirements for sizing secondary containment for bulk storage containers found at §112.8(c)(2).”
- EPA web page: Is My Facility a "Qualified Facility" under the SPCC Rule?: Some states do not allow self-certification. Checked 2026-11-22.
“However, please note that some states do not allow self-certification. You should consult with your state to ensure that SPCC Plan certification is not limited to PEs.”
- EPA 2023 SPCC Expedited Settlement form (2023): $1,750.
“Failure to have a Spill Prevention Control and Countermeasure Plan 112.3 ($1,750)”
- EPA SPCC ICR (2020 renewal), Exhibit A-6, 2018 dollars (2018): $469.
“Prepare an SPCC Plan 1.0 3.0 0.0 0.0 4.0 $0 $469”