SPCC plans for auto shops and equipment dealers

EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).

An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.

  • Free eligibility check first
  • Editable DOCX and PDF
  • Every requirement cited to 40 CFR
  • Missing-element guarantee, plus 30 days no questions asked

The short answer

Shops cross the threshold faster than owners expect, because every drum, tote and bulk lube tank of 55 gallons or more counts at its full shell capacity, and used oil counts as oil (40 CFR 112.2). If the total is more than 1,320 gallons (40 CFR 112.1(d)(2)(ii)) and a spill could reach a storm drain or ditch that leads to water (40 CFR 112.1(b)), you need a plan. If the total is 10,000 gallons or less, no container is over 5,000 gallons and you have a clean spill record, the shop is a Tier I qualified facility and you can certify the plan yourself (40 CFR 112.3(g)(1)).

What counts in a shop

What your plan must cover

The intake asks about each of these for your shop, and the plan states what you have and what you still need to fix.

A quick check on drum containment

A spill pallet for four 55-gallon drums must hold at least one full drum, plus room for rain if it sits outside. Indoors, under this plan's design criterion, that is 100% of the largest container; outdoors, the larger of 110% of the largest container and the container plus a design rainfall (EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22). Check yours with the calculator.

Find out in a few questions whether you need a plan, and which tier

The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.

Start the free eligibility check
Do I need a Professional Engineer?

Not if your facility is a qualified facility: 10,000 gallons or less of aboveground oil storage, and in the past 3 years no single discharge to water over 1,000 gallons and no two over 42 gallons within 12 months (40 CFR 112.3(g)(2)). Farms have their own limits set by statute; see SPCC for farms.

You do need a licensed PE when: your facility is over those limits (40 CFR 112.3(d)); containment is not practicable somewhere and you want to use alternative measures instead (40 CFR 112.6(b)(4)(i)); or your state limits plan certification to engineers. A PE must visit the site (40 CFR 112.3(d)(1)(ii)), so no document tool can replace one. If the free check finds you need a PE, it tells you why and we do not sell you a plan. To find one, look up licensed engineers through your state's engineering licensing board and ask for SPCC experience.

What if my site is unusual?

The intake asks about each container separately: shop-built or factory, single or double wall, indoors or out, what containment it has, and how it is filled. Anything the rules treat differently (mobile refuelers, oil-filled equipment, double-wall tanks, buried piping, a dike with several tanks in it) gets its own plan text and calculation. Where your answers show a gap, such as containment that is too small, the plan says so on the cover, leaves that item unchecked, and lists the work as its own paragraph with the target date you set, instead of hiding it.

Some situations are outside what a self-certified plan can do, and we say so: oil production facilities, and any spot where you would claim containment is impracticable (40 CFR 112.6(a)(1)(vii)). Those need a PE.

How long does it take?

The free eligibility check is short and needs only your container sizes and spill history. The full intake takes longer, mostly because you need your tank list, the inside dimensions of each dike or curbed area, and your contacts in front of you. You can stop and come back from the emailed link. After payment the documents generate right away, and you can download the DOCX and PDF as soon as they are ready.

If an inspector gave you a deadline, note that EPA's expedited settlement process gives facilities 30 days to correct violations and sign (EPA 2023 SPCC Expedited Settlement memo (2023)).

Related

A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.

Sources cited on this page

Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.

  • 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
    “| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
  • 40 CFR 112.1(b): Reasonable expectation of a discharge to navigable waters. Checked 2026-11-21.
    “which due to its location, could reasonably be expected to discharge oil in quantities that may be harmful, as described in part 110 of this chapter, into or upon the navigable waters of the United States or adjoining shorelines”
  • 40 CFR 112.1(d)(1)(i): Discharge determination ignores dikes and other manmade features. Checked 2026-11-21.
    “This determination must be based solely upon consideration of the geographical and location aspects of the facility (such as proximity to navigable waters or adjoining shorelines, land contour, drainage, etc.) and must exclude consideration of manmade features such as dikes, equipment or other structures”
  • 40 CFR 112.1(d)(2)(ii): Only containers of 55 gallons or more are counted. Checked 2026-11-21.
    “For the purposes of this exemption, only containers with a capacity of 55 U.S. gallons or greater are counted.”
  • 40 CFR 112.1(d)(2)(ii): Aggregate aboveground oil storage threshold. Checked 2026-11-21.
    “The aggregate aboveground storage capacity of the facility is 1,320 U.S. gallons or less of oil.”
  • 40 CFR 112.1(d)(5): Containers under 55 gallons are exempt. Checked 2026-11-21.
    “Any container with a storage capacity of less than 55 gallons of oil.”
  • 40 CFR 112.1(d)(7): Motive power containers are exempt (fuel transfers into them are not). Checked 2026-11-21.
    “Any “motive power container,” as defined in § 112.2. The transfer of fuel or other oil into a motive power container at an otherwise regulated facility is not eligible for this exemption.”
  • 40 CFR 112.2: Oil includes petroleum, vegetable oils and animal fats. Checked 2026-11-21.
    “Oil means oil of any kind or in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil.”
  • 40 CFR 112.3(d): A PE must certify the Plan unless the facility qualifies under 112.6. Checked 2026-11-21.
    “Except as provided in § 112.6, a licensed Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of this part.”
  • 40 CFR 112.3(d)(1)(ii): PE certification includes a site visit by the PE or agent. Checked 2026-11-21.
    “That he or his agent has visited and examined the facility;”
  • 40 CFR 112.3(g)(1): Tier I: no aboveground container over 5,000 gallons. Checked 2026-11-21.
    “has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons.”
  • 40 CFR 112.3(g)(2): Qualified facility: 10,000 gallons or less aboveground. Checked 2026-11-21.
    “and has an aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less.”
  • 40 CFR 112.3(g)(2): Qualified facility: no single discharge over 1,000 gallons. Checked 2026-11-21.
    “A Tier II qualified facility is one that has had no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons”
  • 40 CFR 112.3(g)(2): Qualified facility: no two discharges over 42 gallons within 12 months. Checked 2026-11-21.
    “no two discharges as described in § 112.1(b) each exceeding 42 U.S. gallons within any twelve month period in the three years prior to the SPCC Plan self-certification date”
  • 40 CFR 112.6(a)(1)(vii): Tier I: impracticability is not available. Checked 2026-11-21.
    “The Plan does not deviate from any requirement of this part as allowed by § 112.7(a)(2) and 112.7(d) or include measures pursuant to § 112.9(c)(6) for produced water containers and any associated piping; and”
  • 40 CFR 112.6(a)(3)(ii): Mobile and portable containers: positioned to prevent a discharge (Tier I). Checked 2026-11-21.
    “Position or locate mobile or portable oil storage containers to prevent a discharge as described in § 112.1(b).”
  • 40 CFR 112.6(a)(3)(ii): Bulk storage and mobile containers: largest container plus precipitation (Tier I). Checked 2026-11-21.
    “Construct all bulk storage container installations (except mobile refuelers and other non-transportation-related tank trucks), including mobile or portable oil storage containers, so that you provide a secondary means of containment for the entire capacity of the largest single container plus additional capacity to contain precipitation.”
  • 40 CFR 112.6(b)(4)(i): PE-certified portions (hybrid Plan) are outside this product. Checked 2026-11-21.
    “As described in paragraph (b)(3) of this section, the facility owner or operator may not self-certify alternative measures allowed under § 112.7(a)(2) or (d), that are included in the facility's Plan. Such measures must be reviewed and certified, in writing, by a licensed Professional Engineer.”
  • 40 CFR 112.7(a)(3)(ii): Procedures for routine handling of products. Checked 2026-11-21.
    “Discharge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.);”
  • 40 CFR 112.7(c): Transfer areas need general secondary containment. Checked 2026-11-21.
    “Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge as described in § 112.1(b)”
  • 40 CFR 112.7(f)(1): Train oil-handling personnel. Checked 2026-11-21.
    “At a minimum, train your oil-handling personnel in the operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility SPCC Plan.”
  • 40 CFR 112.7(f)(3): Discharge prevention briefing at least once a year. Checked 2026-11-21.
    “Schedule and conduct discharge prevention briefings for your oil-handling personnel at least once a year to assure adequate understanding of the SPCC Plan for that facility.”
  • 40 CFR 112.8(c)(2): Containment inside a building: no precipitation allowance; drains and openings. Checked 2026-11-21.
    “sufficient freeboard to contain precipitation”
  • 40 CFR 112.8(c)(11): Designated storage area for mobile containers. Checked 2026-11-22.
    “Position or locate mobile or portable oil storage containers to prevent a discharge as described in § 112.1(b).”
  • 40 CFR Part 112 Appendix G: Oil-filled operational equipment counts toward capacity. Checked 2026-11-21.
    “Aboveground storage containers that must be included when calculating total facility oil storage capacity include: tanks and mobile or portable containers; oil-filled operational equipment (e.g. transformers)”
  • 40 CFR Part 112 Appendix G: Tier I: portable containers (drums, totes, IBCs) visual monthly. Checked 2026-11-21.
    “Portable containers (including drums, totes, and”
  • EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22: Containment sizing calculation (EPA guidance method). Checked 2026-11-21.
    “A “110 percent of storage tank capacity” rule of thumb may be an acceptable design criterion in many situations”
  • EPA 2023 SPCC Expedited Settlement form (2023): $1,750.
    “Failure to have a Spill Prevention Control and Countermeasure Plan 112.3 ($1,750)”
  • EPA 2023 SPCC Expedited Settlement memo (2023): 30 days.
    “Respondents are given 30 days to return a signed”