EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).

An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.

  • Free eligibility check first
  • Editable DOCX and PDF
  • Every requirement cited to 40 CFR
  • Missing-element guarantee, plus 30 days no questions asked

The short answer

The review statement reads: “I have completed review and evaluation of the SPCC Plan for [facility] on [date], and will (will not) amend the Plan as a result.” (40 CFR 112.5(b))

What to check during the review

  1. Containers: every container of 55 gallons or more is in the table, with the right capacity and oil. Added, removed, replaced or moved containers are changes that may need an amendment (40 CFR 112.5(a)).
  2. Containment: each dike or pallet still holds the largest container plus rain, and nothing new is standing in it (EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22).
  3. Still qualified? Total capacity still 10,000 gallons or less, no Tier I container over 5,000 gallons, and no disqualifying spills (40 CFR 112.3(g)(2), 40 CFR 112.3(g)(2)).
  4. Records: monthly inspection logs and annual briefing logs for the last 3 years are there (40 CFR 112.7(e), 40 CFR 112.7(f)(3)).
  5. Contacts: names and 24-hour numbers are current, including the National Response Center (40 CFR 112.7(a)(3)(vi)).
  6. Technology: whether field-proven equipment (for example high-level alarms, double-wall tanks, better containment) would significantly reduce spill risk (40 CFR 112.5(b)).

You may not be able to wait five years

This Plan is amended whenever there is a change in the facility's design, construction, operation or maintenance that materially affects its potential for a discharge to navigable waters or adjoining shorelines. (40 CFR 112.5(a))

Changes that may require an amendment include: commissioning or decommissioning containers; replacing, reconstructing or moving containers; reconstructing, replacing or installing piping; construction or demolition that might alter secondary containment; changes of product or service; and revisions to standard operating or maintenance procedures. (40 CFR 112.5(a))

An amendment for a facility change is prepared within 6 months of the change and implemented as soon as possible, but not later than 6 months after it is prepared. (40 CFR 112.5(a))

Who signs the amendment: Any technical amendment to this Plan is re-certified by the owner or operator in accordance with Section I (the self-certification statement) and recorded in the Technical Amendment Log. (40 CFR 112.6(a)(2)) In a Tier II plan: Technical amendments to this self-certified Plan are certified by the owner or operator using the Tier II self-certification statement, except that amendments affecting any PE-certified portion must be certified by a Professional Engineer. (40 CFR 112.6(b)(2))

If the change pushes you past your tier: If a change makes any aboveground container larger than 5,000 U.S. gallons or the aggregate aboveground capacity larger than 10,000 U.S. gallons, then within 6 months after preparing the amendment the owner or operator must prepare and implement a Tier II Plan (if the facility still qualifies) or a PE-certified Plan. (40 CFR 112.6(a)(2))

No plan to review?

If your plan is missing or was never finished, a review will not fix it. Start with the free check; it builds a current plan from your containers today, with the review log and amendment log ready to use.

Find out in a few questions whether you need a plan, and which tier

The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.

Start the free eligibility check
What if the rules change?

Every plan prints the date each rule was checked against the eCFR and the version of our rules library it was built from. When a rule we cite changes, buyers of the plan with a year of updates get a regenerated plan at no charge for 12 months. Separately, the rule itself requires you to review your plan at least every 5 years (40 CFR 112.5(b)) and to amend it within 6 months of a change at your facility that affects spill potential (40 CFR 112.5(a)). Edit your answers and regenerate to do that.

Is a plan made with this tool accepted?

EPA does not pre-approve SPCC plans, and you do not file yours with EPA: you keep it at the facility and show it on request (40 CFR 112.3(e)). What makes a plan acceptable is that it contains every element Part 112 requires for your facility, that it is certified by the right person, and that you actually do what it says. For a qualified facility, the right person is you: the owner or operator may self-certify (40 CFR 112.3(g)).

Our Tier I plans cover every section of EPA's own Appendix G template, with a cross-reference to each template section and each requirement 112.6(a)(3) lists, and Tier II plans include a cross-reference to every applicable paragraph of 112.7 and 112.8. Every requirement in the plan prints its 40 CFR citation, so an inspector can check it against the rule. One caution: Compliance with 40 CFR part 112 does not relieve the owner or operator from compliance with other Federal, State, or local laws (40 CFR 112.1(e)). EPA notes that some states do not allow self-certification and advises consulting your state to make sure SPCC Plan certification is not limited to Professional Engineers.

Related

A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.

Sources cited on this page

Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.

  • 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
    “| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
  • 40 CFR 112.1(d)(2)(ii): Only containers of 55 gallons or more are counted. Checked 2026-11-21.
    “For the purposes of this exemption, only containers with a capacity of 55 U.S. gallons or greater are counted.”
  • 40 CFR 112.3(e): The Plan is not filed with EPA. Checked 2026-11-21.
    “Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan available to the Regional Administrator for on-site review during normal working hours.”
  • 40 CFR 112.3(g): Qualified facilities may self-certify. Checked 2026-11-21.
    “The owner or operator of a qualified facility as defined in this subparagraph may self-certify his facility's Plan, as provided in § 112.6.”
  • 40 CFR 112.3(g)(1): Tier I: no aboveground container over 5,000 gallons. Checked 2026-11-21.
    “has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons.”
  • 40 CFR 112.3(g)(2): Qualified facility: 10,000 gallons or less aboveground. Checked 2026-11-21.
    “and has an aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less.”
  • 40 CFR 112.3(g)(2): Qualified facility: no single discharge over 1,000 gallons. Checked 2026-11-21.
    “A Tier II qualified facility is one that has had no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons”
  • 40 CFR 112.5(a): Prepare an amendment within six months; implement within six months after. Checked 2026-11-21.
    “An amendment made under this section must be prepared within six months, and implemented as soon as possible, but not later than six months following preparation of the amendment.”
  • 40 CFR 112.5(a): Examples of changes that may require an amendment. Checked 2026-11-21.
    “Examples of changes that may require amendment of the Plan include, but are not limited to: commissioning or decommissioning containers; replacement, reconstruction, or movement of containers; reconstruction, replacement, or installation of piping systems; construction or demolition that might alter secondary containment structures; changes of product or service; or revision of standard operation or maintenance procedures at a facility.”
  • 40 CFR 112.5(a): Amend when a change materially affects discharge potential. Checked 2026-11-21.
    “when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § 112.1(b).”
  • 40 CFR 112.5(b): Review and evaluate the Plan at least once every five years. Checked 2026-11-21.
    “complete a review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was required under this part.”
  • 40 CFR 112.5(b): Amend within six months to add field-proven technology. Checked 2026-11-21.
    “you must amend your SPCC Plan within six months of the review to include more effective prevention and control technology if the technology has been field-proven at the time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility.”
  • 40 CFR 112.5(b): Implement any amendment within six months of preparing it. Checked 2026-11-21.
    “You must implement any amendment as soon as possible, but not later than six months following preparation of any amendment.”
  • 40 CFR 112.5(b): Document each review and sign whether the Plan will be amended. Checked 2026-11-21.
    “You must document your completion of the review and evaluation, and must sign a statement as to whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan.”
  • 40 CFR 112.5(b): Five-year review statement wording. Checked 2026-11-21.
    “The following words will suffice, “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), and will (will not) amend the Plan as a result.””
  • 40 CFR 112.6(a)(2): Tier I: self-certify technical amendments. Checked 2026-11-21.
    “You must certify any technical amendments to your Plan in accordance with paragraph (a)(1) of this section when there is a change in the facility design, construction, operation, or maintenance that affects its potential for a discharge as described in § 112.1(b).”
  • 40 CFR 112.6(a)(2): Tier I: facility outgrows Tier I. Checked 2026-11-21.
    “If the facility change results in the facility no longer meeting the Tier I qualifying criteria in § 112.3(g)(1) because an individual oil storage container capacity exceeds 5,000 U.S. gallons or the facility capacity exceeds 10,000 U.S. gallons in aggregate aboveground storage capacity, within six months following preparation of the amendment, you must either:”
  • 40 CFR 112.6(b)(2): Tier II: self-certify technical amendments. Checked 2026-11-21.
    “If you self-certify your Plan pursuant to paragraph (b)(1) of this section, you must certify any technical amendments to your Plan in accordance with paragraph (b)(1) of this section when there is a change in the facility design, construction, operation, or maintenance that affects its potential for a discharge as described in § 112.1(b), except:”
  • 40 CFR 112.7(a)(3)(vi): Contact list and phone numbers. Checked 2026-11-21.
    “Contact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge as described in § 112.1(b).”
  • 40 CFR 112.7(e): Keep signed inspection records with the Plan for three years. Checked 2026-11-21.
    “You must keep these written procedures and a record of the inspections and tests, signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years.”
  • 40 CFR 112.7(f)(3): Discharge prevention briefing at least once a year. Checked 2026-11-21.
    “Schedule and conduct discharge prevention briefings for your oil-handling personnel at least once a year to assure adequate understanding of the SPCC Plan for that facility.”
  • EPA SPCC Guidance for Regional Inspectors sec. 4.3.2 and Figures 4-5 and 4-6, pp. 4-19 to 4-22: Containment sizing calculation (EPA guidance method). Checked 2026-11-21.
    “A “110 percent of storage tank capacity” rule of thumb may be an acceptable design criterion in many situations”
  • EPA web page: Is My Facility a "Qualified Facility" under the SPCC Rule?: Some states do not allow self-certification. Checked 2026-11-22.
    “However, please note that some states do not allow self-certification. You should consult with your state to ensure that SPCC Plan certification is not limited to PEs.”
  • EPA 2023 SPCC Expedited Settlement form (2023): $1,750.