40 CFR 112.6, 112.7 and 112.8

SPCC plan requirements

EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).

An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.

  • Free eligibility check first
  • Editable DOCX and PDF
  • Every requirement cited to 40 CFR
  • Missing-element guarantee, plus 30 days no questions asked

This page lists what a self-certified SPCC plan for a small onshore facility must contain and what the facility must do, in the words of our rules library. Each item links to the paragraph of the eCFR it comes from. Tier I plans meet these through the Appendix G template sections; Tier II plans must also address every applicable paragraph of 112.7 and 112.8 (40 CFR 112.6(b)(3)).

Certification · Oil storage · Containment · Transfers and overfill · Inspections · Training · Security · Spill response · Records and review

Certification

Oil storage

Secondary containment

How to size containment, with a calculator: secondary containment calculator.

Transfers and overfill prevention

Inspections and testing

The items in a monthly inspection: SPCC inspection checklist.

Training

Security

Spill response and reporting

Records, location and review

How the plan proves each one

What an EPA inspector, auditor or buyer checks, and where it is in your plan
What they checkRequired bySection of your planPlans
Signed certification by the owner or operatorQualified facilities may self-certify
40 CFR 112.3(g), 40 CFR 112.6(a)(1)(ii)
Self-certificationTier I and II
Management approval to commit resourcesFull approval of management
40 CFR 112.7
Self-certificationTier I and II
Facility name, address and ownerFacility Description
40 CFR Part 112 Appendix G
Facility informationTier I and II
Every oil container of 55 gallons or more, with oil type and capacityIII.1 Oil Storage Containers (Table G-2)
40 CFR Part 112 Appendix G, 40 CFR 112.7(a)(3)(i)
Oil storage containersTier I and II
Facility diagram with container locations
Included in Tier I plans too, though not required there
Physical layout and facility diagram
40 CFR 112.7(a)(3)
Facility diagramTier II
Secondary containment sized for the largest container plus rainBulk storage and mobile containers: largest container plus precipitation (Tier I)
40 CFR 112.6(a)(3)(ii), 40 CFR 112.8(c)(2), EPA SPCC Guidance for Regional Inspectors sec. 4.3.1, p. 4-18
Secondary containmentTier I and II
General containment for transfer areas, piping and equipmentGeneral secondary containment for all oil-handling areas
40 CFR 112.7(c)
Secondary containmentTier I and II
Overfill prevention for each containerTier I: overfill prevention system or documented procedure
40 CFR 112.6(a)(3)(iii), 40 CFR 112.8(c)(8)
Loading, unloading and transfersTier I and II
Loading, unloading and transfer procedures
Tier I plans print the transfer steps as the way the overfill and containment requirements are carried out; 112.7(a)(3)(ii) is not a Tier I requirement
Procedures for routine handling of products
40 CFR 112.7(a)(3)(ii)
Loading, unloading and transfersTier II
Inspection and integrity testing schedule per an industry standardIntegrity test or inspect each aboveground container on a regular schedule
40 CFR 112.8(c)(6), 40 CFR Part 112 Appendix G
Inspections and testingTier I and II
Signed inspection records kept three yearsKeep signed inspection records with the Plan for three years
40 CFR 112.7(e)
RecordsTier I and II
Rainwater drainage from diked areas, with a log
Tier I plans have no separate drainage section: this is Section A (Table G-10) in the containment section, with the Attachment 3.3 log
Draining rainwater from diked areas
40 CFR 112.8(c)(3)
Facility drainageTier I and II
Training of oil-handling personnelTrain oil-handling personnel
40 CFR 112.7(f)(1)
Personnel trainingTier I and II
A named person accountable for discharge preventionDesignated person accountable for discharge prevention
40 CFR 112.7(f)(2)
Personnel trainingTier I and II
Discharge prevention briefing at least once a year, with a logDischarge prevention briefing at least once a year
40 CFR 112.7(f)(3), 40 CFR Part 112 Appendix G
Personnel trainingTier I and II
Security: access, valves, pump starters, connections, lightingDescribe security measures
40 CFR 112.7(g)
SecurityTier I and II
What staff do when oil is spilledCountermeasures for discharge discovery, response and cleanup
40 CFR 112.7(a)(3)(iv)
Discharge response and notificationTier I and II
Emergency contact list including the National Response CenterContact list and phone numbers
40 CFR 112.7(a)(3)(vi), 40 CFR Part 112 Appendix G
Emergency contactsTier I and II
What to report after a discharge, and the 60-day report triggerInformation to give when reporting a discharge
40 CFR 112.7(a)(4), 40 CFR 112.4(a)
Discharge response and notificationTier I and II
Five-year review log and amendment recordReview and evaluate the Plan at least once every five years
40 CFR 112.5(b)
Five-year review and amendment logTier I and II
Where the plan is keptWhere the Plan is kept
40 CFR 112.3(e)(1)
RecordsTier I and II

Find out in a few questions whether you need a plan, and which tier

The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.

Start the free eligibility check
Is a plan made with this tool accepted?

EPA does not pre-approve SPCC plans, and you do not file yours with EPA: you keep it at the facility and show it on request (40 CFR 112.3(e)). What makes a plan acceptable is that it contains every element Part 112 requires for your facility, that it is certified by the right person, and that you actually do what it says. For a qualified facility, the right person is you: the owner or operator may self-certify (40 CFR 112.3(g)).

Our Tier I plans cover every section of EPA's own Appendix G template, with a cross-reference to each template section and each requirement 112.6(a)(3) lists, and Tier II plans include a cross-reference to every applicable paragraph of 112.7 and 112.8. Every requirement in the plan prints its 40 CFR citation, so an inspector can check it against the rule. One caution: Compliance with 40 CFR part 112 does not relieve the owner or operator from compliance with other Federal, State, or local laws (40 CFR 112.1(e)). EPA notes that some states do not allow self-certification and advises consulting your state to make sure SPCC Plan certification is not limited to Professional Engineers.

What if my site is unusual?

The intake asks about each container separately: shop-built or factory, single or double wall, indoors or out, what containment it has, and how it is filled. Anything the rules treat differently (mobile refuelers, oil-filled equipment, double-wall tanks, buried piping, a dike with several tanks in it) gets its own plan text and calculation. Where your answers show a gap, such as containment that is too small, the plan says so on the cover, leaves that item unchecked, and lists the work as its own paragraph with the target date you set, instead of hiding it.

Some situations are outside what a self-certified plan can do, and we say so: oil production facilities, and any spot where you would claim containment is impracticable (40 CFR 112.6(a)(1)(vii)). Those need a PE.

What if the rules change?

Every plan prints the date each rule was checked against the eCFR and the version of our rules library it was built from. When a rule we cite changes, buyers of the plan with a year of updates get a regenerated plan at no charge for 12 months. Separately, the rule itself requires you to review your plan at least every 5 years (40 CFR 112.5(b)) and to amend it within 6 months of a change at your facility that affects spill potential (40 CFR 112.5(a)). Edit your answers and regenerate to do that.

Related

A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.

Sources cited on this page

Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.

  • 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
    “| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
  • 40 CFR 112.3(e): The Plan is not filed with EPA. Checked 2026-11-21.
    “Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not so attended, and (2) Have the Plan available to the Regional Administrator for on-site review during normal working hours.”
  • 40 CFR 112.3(e)(1): Where the Plan is kept. Checked 2026-11-21.
    “Maintain a complete copy of the Plan at the facility if the facility is normally attended at least four hours per day, or at the nearest field office if the facility is not so attended, and”
  • 40 CFR 112.3(g): Qualified facilities may self-certify. Checked 2026-11-21.
    “The owner or operator of a qualified facility as defined in this subparagraph may self-certify his facility's Plan, as provided in § 112.6.”
  • 40 CFR 112.4(a): Report to the EPA Regional Administrator within 60 days after large or repeated discharges. Checked 2026-11-21.
    “whenever your facility has discharged more than 1,000 U.S. gallons of oil in a single discharge as described in § 112.1(b), or discharged more than 42 U.S. gallons of oil in each of two discharges as described in § 112.1(b), occurring within any twelve month period, submit the following information to the Regional Administrator within 60 days from the time the facility becomes subject to this section:”
  • 40 CFR 112.5(a): Amend when a change materially affects discharge potential. Checked 2026-11-21.
    “when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § 112.1(b).”
  • 40 CFR 112.5(a): Prepare an amendment within six months; implement within six months after. Checked 2026-11-21.
    “An amendment made under this section must be prepared within six months, and implemented as soon as possible, but not later than six months following preparation of the amendment.”
  • 40 CFR 112.5(b): Review and evaluate the Plan at least once every five years. Checked 2026-11-21.
    “complete a review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was required under this part.”
  • 40 CFR 112.5(b): Document each review and sign whether the Plan will be amended. Checked 2026-11-21.
    “You must document your completion of the review and evaluation, and must sign a statement as to whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan.”
  • 40 CFR 112.6(a)(1)(ii): The certifying owner or operator visits and examines the facility (personally, per EPA's FAQ). Checked 2026-11-21.
    “You have visited and examined the facility;”
  • 40 CFR 112.6(a)(1)(v): Self-certifier commits to fully implement the Plan. Checked 2026-11-21.
    “You will fully implement the Plan;”
  • 40 CFR 112.6(a)(1)(vi): Tier I attestation that the facility meets 112.3(g)(1). Checked 2026-11-21.
    “The facility meets the qualification criteria in § 112.3(g)(1);”
  • 40 CFR 112.6(a)(1)(vii): Tier I: impracticability is not available. Checked 2026-11-21.
    “The Plan does not deviate from any requirement of this part as allowed by § 112.7(a)(2) and 112.7(d) or include measures pursuant to § 112.9(c)(6) for produced water containers and any associated piping; and”
  • 40 CFR 112.6(a)(3)(ii): Bulk storage and mobile containers: largest container plus precipitation (Tier I). Checked 2026-11-21.
    “Construct all bulk storage container installations (except mobile refuelers and other non-transportation-related tank trucks), including mobile or portable oil storage containers, so that you provide a secondary means of containment for the entire capacity of the largest single container plus additional capacity to contain precipitation.”
  • 40 CFR 112.6(a)(3)(ii): Mobile and portable containers: positioned to prevent a discharge (Tier I). Checked 2026-11-21.
    “Position or locate mobile or portable oil storage containers to prevent a discharge as described in § 112.1(b).”
  • 40 CFR 112.6(a)(3)(iii): Tier I: overfill prevention system or documented procedure. Checked 2026-11-21.
    “Ensure that each container is provided with a system or documented procedure to prevent overfills of the container, describe the system or procedure in the SPCC Plan and regularly test to ensure proper operation or efficacy.”
  • 40 CFR 112.6(b)(3): Tier II Plan must meet 112.7 and the applicable requirements of subparts B and C. Checked 2026-11-21.
    “Except as provided in this paragraph, your self-certified SPCC Plan must comply with § 112.7 and the applicable requirements in subparts B and C of this part:”
  • 40 CFR 112.7: Full approval of management. Checked 2026-11-21.
    “The Plan must have the full approval of management at a level of authority to commit the necessary resources to fully implement the Plan.”
  • 40 CFR 112.7(a)(3): Physical layout and facility diagram. Checked 2026-11-21.
    “Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located.”
  • 40 CFR 112.7(a)(3)(i): Type of oil and capacity of each container. Checked 2026-11-21.
    “The type of oil in each fixed container and its storage capacity. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities;”
  • 40 CFR 112.7(a)(3)(ii): Procedures for routine handling of products. Checked 2026-11-21.
    “Discharge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.);”
  • 40 CFR 112.7(a)(3)(iv): Countermeasures for discharge discovery, response and cleanup. Checked 2026-11-21.
    “Countermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor);”
  • 40 CFR 112.7(a)(3)(vi): Contact list and phone numbers. Checked 2026-11-21.
    “Contact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge as described in § 112.1(b).”
  • 40 CFR 112.7(a)(4): Information to give when reporting a discharge. Checked 2026-11-21.
    “provide information and procedures in your Plan to enable a person reporting a discharge as described in § 112.1(b) to relate information on the exact address or location and phone number of the facility; the date and time of the discharge, the type of material discharged; estimates of the total quantity discharged; estimates of the quantity discharged as described in § 112.1(b); the source of the discharge; a description of all affected media; the cause of the discharge; any damages or injuries caused by the discharge; actions being used to stop, remove, and mitigate the effects of the discharge; whether an evacuation may be needed; and, the names of individuals and/or organizations who have also been contacted.”
  • 40 CFR 112.7(a)(5): Emergency procedures organized for use in an emergency. Checked 2026-11-21.
    “organize portions of the Plan describing procedures you will use when a discharge occurs in a way that will make them readily usable in an emergency, and include appropriate supporting material as appendices.”
  • 40 CFR 112.7(c): General secondary containment for all oil-handling areas. Checked 2026-11-21.
    “Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge as described in § 112.1(b), except as provided in paragraph (k) of this section for qualified oil-filled operational equipment”
  • 40 CFR 112.7(c): Transfer areas need general secondary containment. Checked 2026-11-21.
    “Provide appropriate containment and/or diversionary structures or equipment to prevent a discharge as described in § 112.1(b)”
  • 40 CFR 112.7(c)(1): Acceptable general containment methods. Checked 2026-11-21.
    “(i) Dikes, berms, or retaining walls sufficiently impervious to contain oil; (ii) Curbing or drip pans; (iii) Sumps and collection systems; (iv) Culverting, gutters, or other drainage systems; (v) Weirs, booms, or other barriers; (vi) Spill diversion ponds; (vii) Retention ponds; or (viii) Sorbent materials.”
  • 40 CFR 112.7(e): Keep signed inspection records with the Plan for three years. Checked 2026-11-21.
    “You must keep these written procedures and a record of the inspections and tests, signed by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years.”
  • 40 CFR 112.7(f)(1): Train oil-handling personnel. Checked 2026-11-21.
    “At a minimum, train your oil-handling personnel in the operation and maintenance of equipment to prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and regulations; general facility operations; and, the contents of the facility SPCC Plan.”
  • 40 CFR 112.7(f)(2): Designated person accountable for discharge prevention. Checked 2026-11-21.
    “Designate a person at each applicable facility who is accountable for discharge prevention and who reports to facility management.”
  • 40 CFR 112.7(f)(3): Discharge prevention briefing at least once a year. Checked 2026-11-21.
    “Schedule and conduct discharge prevention briefings for your oil-handling personnel at least once a year to assure adequate understanding of the SPCC Plan for that facility.”
  • 40 CFR 112.7(f)(3): What each briefing covers. Checked 2026-11-21.
    “Such briefings must highlight and describe known discharges as described in § 112.1(b) or failures, malfunctioning components, and any recently developed precautionary measures.”
  • 40 CFR 112.7(g): Describe security measures. Checked 2026-11-21.
    “Describe in your Plan how you secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges.”
  • 40 CFR 112.7(g): Secure master flow and drain valves. Checked 2026-11-21.
    “secure master flow and drain valves”
  • 40 CFR 112.7(g): Secure and control access to oil areas. Checked 2026-11-21.
    “Describe in your Plan how you secure and control access to the oil handling, processing and storage areas”
  • 40 CFR 112.7(h)(1): Loading/unloading rack: contain the largest tank truck compartment. Checked 2026-11-21.
    “You must design any containment system to hold at least the maximum capacity of any single compartment of a tank car or tank truck loaded or unloaded at the facility.”
  • 40 CFR 112.8(c)(1): Containers compatible with the oil stored. Checked 2026-11-21.
    “Not use a container for the storage of oil unless its material and construction are compatible with the material stored and conditions of storage such as pressure and temperature.”
  • 40 CFR 112.8(c)(2): Bulk storage: largest container plus freeboard for precipitation (Tier II). Checked 2026-11-21.
    “Construct all bulk storage tank installations (except mobile refuelers and other non-transportation-related tank trucks) so that you provide a secondary means of containment for the entire capacity of the largest single container and sufficient freeboard to contain precipitation.”
  • 40 CFR 112.8(c)(2): Diked areas must be sufficiently impervious. Checked 2026-11-21.
    “You must ensure that diked areas are sufficiently impervious to contain discharged oil.”
  • 40 CFR 112.8(c)(3): Draining rainwater from diked areas. Checked 2026-11-21.
    “Not allow drainage of uncontaminated rainwater from the diked area into a storm drain or discharge of an effluent into an open watercourse, lake, or pond, bypassing the facility treatment system unless you: (i) Normally keep the bypass valve sealed closed. (ii) Inspect the retained rainwater to ensure that its presence will not cause a discharge as described in § 112.1(b). (iii) Open the bypass valve and reseal it following drainage under responsible supervision; and (iv) Keep adequate records of such events”
  • 40 CFR 112.8(c)(6): Integrity test or inspect each aboveground container on a regular schedule. Checked 2026-11-21.
    “Test or inspect each aboveground container for integrity on a regular schedule and whenever you make material repairs.”
  • 40 CFR 112.8(c)(6): Scope, frequency and inspector qualifications per industry standards. Checked 2026-11-21.
    “You must determine, in accordance with industry standards, the appropriate qualifications for personnel performing tests and inspections, the frequency and type of testing and inspections, which take into account container size, configuration, and design (such as containers that are: shop-built, field-erected, skid-mounted, elevated, equipped with a liner, double-walled, or partially buried).”
  • 40 CFR 112.8(c)(6): Frequent visual inspection of container outsides and diked areas. Checked 2026-11-21.
    “In addition, you must frequently inspect the outside of the container for signs of deterioration, discharges, or accumulation of oil inside diked areas.”
  • 40 CFR 112.8(c)(8): Tier II: at least one overfill prevention device per container installation. Checked 2026-11-21.
    “Engineer or update each container installation in accordance with good engineering practice to avoid discharges. You must provide at least one of the following devices:”
  • 40 CFR 112.8(c)(8)(v): Regularly test liquid level sensing devices. Checked 2026-11-21.
    “You must regularly test liquid level sensing devices to ensure proper operation.”
  • 40 CFR 112.8(c)(10): Promptly correct visible leaks and remove oil in diked areas. Checked 2026-11-21.
    “Promptly correct visible discharges which result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts. You must promptly remove any accumulations of oil in diked areas.”
  • 40 CFR 112.8(d)(4): Regularly inspect aboveground valves, piping and appurtenances. Checked 2026-11-21.
    “Regularly inspect all aboveground valves, piping, and appurtenances. During the inspection you must assess the general condition of items, such as flange joints, expansion joints, valve glands and bodies, catch pans, pipeline supports, locking of valves, and metal surfaces.”
  • 40 CFR 112.8(d)(4): Integrity and leak test buried piping when installed or changed. Checked 2026-11-21.
    “You must also conduct integrity and leak testing of buried piping at the time of installation, modification, construction, relocation, or replacement.”
  • 40 CFR Part 112 Appendix G: III.1 Oil Storage Containers (Table G-2). Checked 2026-11-21.
    “1. Oil Storage Containers (§112.7(a)(3)(i)):”
  • 40 CFR Part 112 Appendix G: Tier I: inspect shop-built containers per a recognized standard, at least Table G-17. Checked 2026-11-21.
    “To comply with integrity inspection requirement for bulk storage containers, inspect/test each shop-built aboveground bulk storage container on a regular schedule in accordance with a recognized container inspection standard based on the minimum requirements in the following table.”
  • 40 CFR Part 112 Appendix G: National Response Center phone number. Checked 2026-11-21.
    “National Response Center (NRC) 1-800-424-8802”
  • 40 CFR Part 112 Appendix G: Facility Description. Checked 2026-11-21.
    “Facility Description Facility Name Facility Address”
  • 40 CFR Part 112 Appendix G: Attachment 3.4 Oil-handling Personnel Training and Briefing Log (Table G-19). Checked 2026-11-21.
    “ATTACHMENT 3.4 - Oil-handling Personnel Training and Briefing Log”
  • EPA SPCC Guidance for Regional Inspectors sec. 4.3.1, p. 4-18: Keep the containment calculations with the Plan. Checked 2026-11-21.
    “While the rule does not require that secondary containment calculations be kept in the Plan, EPA strongly recommends that the facility owner or operator maintain the calculations”
  • EPA web page: Is My Facility a "Qualified Facility" under the SPCC Rule?: Some states do not allow self-certification. Checked 2026-11-22.
    “However, please note that some states do not allow self-certification. You should consult with your state to ensure that SPCC Plan certification is not limited to PEs.”
  • EPA 2023 SPCC Expedited Settlement form (2023): $1,750.
    “Failure to have a Spill Prevention Control and Countermeasure Plan 112.3 ($1,750)”