Do I need an SPCC plan?
EPA's quick-settlement form for small facilities lists a $1,750 penalty just for having no SPCC plan. A case that goes to court can cost far more (the law allows up to $59,114 a day, 40 CFR 19.4).
An engineer's SPCC plan: $1,500 to over $10,000 (Texas A&M AgriLife Extension) or $2,000 to $4,000 (Purdue Extension); farm extension estimates from 2011 and 2013, the most recent published ranges we could verify. Sources: Texas A&M AgriLife Extension EBN-001 (2013), Purdue Extension via Farm and Dairy (2011). Ours: from $299, one time.
- Free eligibility check first
- Editable DOCX and PDF
- Every requirement cited to 40 CFR
- Missing-element guarantee, plus 30 days no questions asked
The short answer
You need an SPCC plan if both of these are true:
- Capacity: The facility's aggregate aboveground oil storage capacity is more than 1,320 U.S. gallons. (40 CFR 112.1(d)(2)(ii)) Or the completely buried capacity is more than 42,000 gallons (40 CFR 112.1(d)(2)(i)).
- Location: Due to its location, the facility could reasonably be expected to discharge oil in quantities that may be harmful into or upon the navigable waters of the United States or adjoining shorelines. (40 CFR 112.1(b))
Farms have different thresholds set by statute; see SPCC for farms before you count.
How to count your capacity
- Count shell capacity, not how full the tank is. Storage capacity of a container means the shell capacity of the container. (40 CFR 112.2)
- Only containers of 55 gallons or more count. Containers with a storage capacity of less than 55 gallons of oil are exempt and are not counted. (40 CFR 112.1(d)(5))
- "Oil" is broad. Diesel, gasoline, used oil, hydraulic oil, lube oil, vegetable oil and animal fats all count. Oil means oil of any kind or in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil. (40 CFR 112.2)
- Partially buried tanks count as aboveground. Bunkered tanks, partially buried tanks and containers in vaults are aboveground storage containers for Part 112 and count toward the aboveground capacity. (40 CFR 112.1(b)(4))
- Oil-filled equipment counts. Oil-filled operational equipment of 55 gallons or more (for example hydraulic systems and transformers) counts toward the facility's aboveground oil storage capacity, even though it is not a bulk storage container. (40 CFR Part 112 Appendix G)
- Idle tanks count unless they are permanently closed. Containers used for standby, seasonal or temporary storage are covered and counted unless they meet the definition of permanently closed. (40 CFR 112.1(b)(3))
What does not count
- Any onboard bulk storage container used primarily to power the movement of a motor vehicle, or ancillary onboard oil-filled operational equipment (excluding oil drilling or workover equipment, including rigs), is exempt and not counted. An onboard bulk storage container used to store or transfer oil for further distribution, such as a fuel or service truck, is not a motive power container. The transfer of fuel or other oil into a motive power container at an otherwise regulated facility is not eligible for this exemption. (40 CFR 112.1(d)(7))
- A permanently closed container is not counted. Permanently closed means all liquid and sludge has been removed from the container and its connecting lines; all connecting lines and piping are disconnected and blanked off; all valves except ventilation valves are closed and locked; and a conspicuous sign on the container states that it is permanently closed and gives the date of closure. (40 CFR 112.1(d)(2)(ii)(A))
- A container of heating oil used solely at a single-family residence (including the residence on a farm) is exempt and not counted. (40 CFR 112.1(d)(9))
- Pesticide application equipment and related mix containers are exempt and not counted. (40 CFR 112.1(d)(10))
- Hot-mix asphalt and hot-mix asphalt containers are exempt and not counted. Asphalt cement, emulsions and cutbacks not mixed with aggregate are still covered. (40 CFR 112.1(d)(8))
- Completely buried tanks (and their connected underground piping, underground ancillary equipment and containment systems) that are subject to all of the technical requirements of 40 CFR part 280 or a State program approved under 40 CFR part 281 are exempt from Part 112 and are not counted toward the facility's completely buried storage capacity. Where the Plan includes a facility diagram under 40 CFR 112.7(a)(3), the diagram identifies the location of these tanks and marks them as "exempt". (40 CFR 112.1(d)(4))
"Could a spill reach water?" is about location, not your dikes
Whether a discharge could reach navigable waters is decided only from the facility's geography and location (proximity to water, land contour, drainage). Dikes, equipment, buildings and other manmade structures that would hold back a spill are not considered. (40 CFR 112.1(d)(1)(i)) So a shop with a good berm but a storm drain at the end of the lot that empties into a creek still answers yes. Think about the ditches and storm sewers that carry water off your site and where they end up; the free check asks about them, and if you are unsure it treats the answer as yes and tells you why.
When did you need it by?
A facility other than a farm or an oil production facility that becomes operational after 2011-11-10, and could reasonably be expected to have a discharge as described in 40 CFR 112.1(b), must prepare and implement its Plan before it begins operations. (40 CFR 112.3(a)(1))
A facility (other than a farm, an offshore drilling, production or workover facility, or a facility required to have a Facility Response Plan under 40 CFR 112.20(a)) that was in operation on or before 2002-08-16 had to maintain its Plan, amend it if necessary to ensure compliance with 40 CFR part 112, and implement the amended Plan no later than 2011-11-10; one that became operational after 2002-08-16 through 2011-11-10, and could reasonably be expected to have a discharge as described in 40 CFR 112.1(b), had to prepare and implement a Plan on or before 2011-11-10. A facility in this group that is subject to 40 CFR part 112 and still has no Plan is past its compliance date and must prepare and implement one. (40 CFR 112.3(a)(1))
In other words, if your facility is covered and you have no plan, you are already late, and an inspection, an insurer's questionnaire or a buyer's environmental review can bring that to light. EPA's expedited settlement form for small facilities lists $1,750 for having no plan, and penalties in court can reach $59,114 per day (40 CFR 19.4).
If you need a plan: who can certify it?
Unless the facility is a qualified facility that self-certifies under 40 CFR 112.6, a licensed Professional Engineer must review and certify the Plan for it to be effective. (40 CFR 112.3(d)) Smaller facilities with a clean spill record can use the exception: The owner or operator of a Tier I or Tier II qualified facility may self-certify the facility's Plan under 40 CFR 112.6. (40 CFR 112.3(g)). The limits are on the Tier I vs Tier II vs PE page.
Find out in a few questions whether you need a plan, and which tier
The eligibility check is free and needs no account. You see your result, why, and the rule behind it, before anything is for sale. If you need an engineer, it says so.
Start the free eligibility checkQuestions
Do I need a Professional Engineer?
Not if your facility is a qualified facility: 10,000 gallons or less of aboveground oil storage, and in the past 3 years no single discharge to water over 1,000 gallons and no two over 42 gallons within 12 months (40 CFR 112.3(g)(2)). Farms have their own limits set by statute; see SPCC for farms.
You do need a licensed PE when: your facility is over those limits (40 CFR 112.3(d)); containment is not practicable somewhere and you want to use alternative measures instead (40 CFR 112.6(b)(4)(i)); or your state limits plan certification to engineers. A PE must visit the site (40 CFR 112.3(d)(1)(ii)), so no document tool can replace one. If the free check finds you need a PE, it tells you why and we do not sell you a plan. To find one, look up licensed engineers through your state's engineering licensing board and ask for SPCC experience.
What if my site is unusual?
The intake asks about each container separately: shop-built or factory, single or double wall, indoors or out, what containment it has, and how it is filled. Anything the rules treat differently (mobile refuelers, oil-filled equipment, double-wall tanks, buried piping, a dike with several tanks in it) gets its own plan text and calculation. Where your answers show a gap, such as containment that is too small, the plan says so on the cover, leaves that item unchecked, and lists the work as its own paragraph with the target date you set, instead of hiding it.
Some situations are outside what a self-certified plan can do, and we say so: oil production facilities, and any spot where you would claim containment is impracticable (40 CFR 112.6(a)(1)(vii)). Those need a PE.
How long does it take?
The free eligibility check is short and needs only your container sizes and spill history. The full intake takes longer, mostly because you need your tank list, the inside dimensions of each dike or curbed area, and your contacts in front of you. You can stop and come back from the emailed link. After payment the documents generate right away, and you can download the DOCX and PDF as soon as they are ready.
If an inspector gave you a deadline, note that EPA's expedited settlement process gives facilities 30 days to correct violations and sign (EPA 2023 SPCC Expedited Settlement memo (2023)).
Related
A document tool, not engineering or legal advice. You, the owner or operator, certify the plan.
Sources cited on this page
Regulation text from the eCFR, quoted verbatim, with the date we last checked it. See how we check sources.
- 40 CFR 19.4: Civil judicial penalty for failing to comply with SPCC regulations (CWA 311(b)(7)(C)). Checked 2026-11-21.
“| 33 U.S.C. 1321(b)(7)(C) | CWA | 59,114 | 57,617 | 25,000 |”
- 40 CFR 112.1(b): Reasonable expectation of a discharge to navigable waters. Checked 2026-11-21.
“which due to its location, could reasonably be expected to discharge oil in quantities that may be harmful, as described in part 110 of this chapter, into or upon the navigable waters of the United States or adjoining shorelines”
- 40 CFR 112.1(b)(3): Standby, seasonal and temporary storage is still covered. Checked 2026-11-21.
“Any container that is used for standby storage, for seasonal storage, or for temporary storage, or not otherwise “permanently closed” as defined in § 112.2;”
- 40 CFR 112.1(b)(4): Bunkered, partially buried and vaulted containers count as aboveground. Checked 2026-11-21.
“Any “bunkered tank” or “partially buried tank” as defined in § 112.2, or any container in a vault, each of which is considered an aboveground storage container for purposes of this part.”
- 40 CFR 112.1(d)(1)(i): Discharge determination ignores dikes and other manmade features. Checked 2026-11-21.
“This determination must be based solely upon consideration of the geographical and location aspects of the facility (such as proximity to navigable waters or adjoining shorelines, land contour, drainage, etc.) and must exclude consideration of manmade features such as dikes, equipment or other structures”
- 40 CFR 112.1(d)(2)(i): Completely buried oil storage threshold. Checked 2026-11-21.
“The completely buried storage capacity of the facility is 42,000 U.S. gallons or less of oil.”
- 40 CFR 112.1(d)(2)(ii): Aggregate aboveground oil storage threshold. Checked 2026-11-21.
“The aggregate aboveground storage capacity of the facility is 1,320 U.S. gallons or less of oil.”
- 40 CFR 112.1(d)(2)(ii): Only containers of 55 gallons or more are counted. Checked 2026-11-21.
“For the purposes of this exemption, only containers with a capacity of 55 U.S. gallons or greater are counted.”
- 40 CFR 112.1(d)(2)(ii)(A): Permanently closed containers are not counted. Checked 2026-11-21.
“The capacity of a container that is “permanently closed” as defined in § 112.2;”
- 40 CFR 112.1(d)(4): Completely buried part 280/281 tanks are exempt and not counted toward buried capacity. Checked 2026-11-21.
“Any completely buried storage tank, as defined in § 112.2, and connected underground piping, underground ancillary equipment, and containment systems, at any facility, that is subject to all of the technical requirements of part 280 of this chapter or a State program approved under part 281 of this chapter”
- 40 CFR 112.1(d)(5): Containers under 55 gallons are exempt. Checked 2026-11-21.
“Any container with a storage capacity of less than 55 gallons of oil.”
- 40 CFR 112.1(d)(7): Motive power containers are exempt (fuel transfers into them are not). Checked 2026-11-21.
“Any “motive power container,” as defined in § 112.2. The transfer of fuel or other oil into a motive power container at an otherwise regulated facility is not eligible for this exemption.”
- 40 CFR 112.1(d)(8): Hot-mix asphalt and its containers are exempt. Checked 2026-11-21.
“Hot-mix asphalt, or any hot-mix asphalt container.”
- 40 CFR 112.1(d)(9): Heating oil used solely at a single-family residence is exempt. Checked 2026-11-21.
“Any container for heating oil used solely at a single-family residence.”
- 40 CFR 112.1(d)(10): Pesticide application equipment and related mix containers are exempt. Checked 2026-11-21.
“Any pesticide application equipment or related mix containers.”
- 40 CFR 112.2: Storage capacity means shell capacity. Checked 2026-11-21.
“Storage capacity of a container means the shell capacity of the container.”
- 40 CFR 112.2: Oil includes petroleum, vegetable oils and animal fats. Checked 2026-11-21.
“Oil means oil of any kind or in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil.”
- 40 CFR 112.3(a)(1): New non-farm facilities need a Plan before operations begin. Checked 2026-11-21.
“If such a facility (excluding oil production facilities) becomes operational after November 10, 2011, and could reasonably be expected to have a discharge as described in § 112.1(b), you must prepare and implement a Plan before you begin operations.”
- 40 CFR 112.3(a)(1): Facilities in operation by November 10, 2011 needed a Plan by then. Checked 2026-11-21.
“If such a facility becomes operational after August 16, 2002, through November 10, 2011, and could reasonably be expected to have a discharge as described in § 112.1(b), you must prepare and implement a Plan on or before November 10, 2011.”
- 40 CFR 112.3(d): A PE must certify the Plan unless the facility qualifies under 112.6. Checked 2026-11-21.
“Except as provided in § 112.6, a licensed Professional Engineer must review and certify a Plan for it to be effective to satisfy the requirements of this part.”
- 40 CFR 112.3(d)(1)(ii): PE certification includes a site visit by the PE or agent. Checked 2026-11-21.
“That he or his agent has visited and examined the facility;”
- 40 CFR 112.3(g): Qualified facilities may self-certify. Checked 2026-11-21.
“The owner or operator of a qualified facility as defined in this subparagraph may self-certify his facility's Plan, as provided in § 112.6.”
- 40 CFR 112.3(g)(1): Tier I: no aboveground container over 5,000 gallons. Checked 2026-11-21.
“has no individual aboveground oil storage container with a capacity greater than 5,000 U.S. gallons.”
- 40 CFR 112.3(g)(2): Qualified facility: 10,000 gallons or less aboveground. Checked 2026-11-21.
“and has an aggregate aboveground oil storage capacity of 10,000 U.S. gallons or less.”
- 40 CFR 112.3(g)(2): Qualified facility: no single discharge over 1,000 gallons. Checked 2026-11-21.
“A Tier II qualified facility is one that has had no single discharge as described in § 112.1(b) exceeding 1,000 U.S. gallons”
- 40 CFR 112.3(g)(2): Qualified facility: no two discharges over 42 gallons within 12 months. Checked 2026-11-21.
“no two discharges as described in § 112.1(b) each exceeding 42 U.S. gallons within any twelve month period in the three years prior to the SPCC Plan self-certification date”
- 40 CFR 112.6(a)(1)(vii): Tier I: impracticability is not available. Checked 2026-11-21.
“The Plan does not deviate from any requirement of this part as allowed by § 112.7(a)(2) and 112.7(d) or include measures pursuant to § 112.9(c)(6) for produced water containers and any associated piping; and”
- 40 CFR 112.6(b)(4)(i): PE-certified portions (hybrid Plan) are outside this product. Checked 2026-11-21.
“As described in paragraph (b)(3) of this section, the facility owner or operator may not self-certify alternative measures allowed under § 112.7(a)(2) or (d), that are included in the facility's Plan. Such measures must be reviewed and certified, in writing, by a licensed Professional Engineer.”
- 40 CFR Part 112 Appendix G: Oil-filled operational equipment counts toward capacity. Checked 2026-11-21.
“Aboveground storage containers that must be included when calculating total facility oil storage capacity include: tanks and mobile or portable containers; oil-filled operational equipment (e.g. transformers)”
- EPA 2023 SPCC Expedited Settlement form (2023): $1,750.
“Failure to have a Spill Prevention Control and Countermeasure Plan 112.3 ($1,750)”
- EPA 2023 SPCC Expedited Settlement memo (2023): 30 days.
“Respondents are given 30 days to return a signed”